共 12 条
[1]
Minimizing costs of resource requirements in project networks subject to a fixed completion time. M o¨hring R H. Operations Research . 1984
[2]
Optimal resource levelling of multi -resource projects. Younis M A,Saad B. Computers and Industrial Engineering . 1996
[3]
Multiple resource levelling in construction systems through variation of activity intensities. Leachman R C. Naval Research Logistics . 1983
[4]
Time-constrained resource levelling. Seibert J E,Evans G W. Journal of Construction Research . 1991
[5]
Minimizing resource availability costs in time-limited project networks. Demeulemeester E. Management Science . 1995
[6]
A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Demeulemeester E,Herroelen W. Management Science . 1992
[7]
Resource levelling for projects with schedule-dependent time windows. Neumann K,Zimmermann J. European Journal of Operational Research . 1999
[8]
Serial and parallel resource-constrained project scheduling methods revisited:Theory and computation. Kolisch R. European Journal of Op-erational Research . 1996
[9]
A competitive genetic algorithm for resource constrained project scheduling. Hartmann S. Naval Research Logistics . 1998
[10]
Optimal resource levelling using non-serial dynamic programming. Bandelloni M,Tucci M,Rinaldi R. European Journal of Operational Research . 1994