共 9 条
[1]
[2]
[3]
[4]
解读当量电价法[J] 顾晓荣 电力系统自动化 2004, 09
[5]
[6]
Study of impacts of physical contracts and financial contracts on bidding strategies of GENCOs[J] Xiaoling Chen;Y. He;Y.H. Song;Yosuke Nakanishi;Chikashi Nakanishi;Satoru Takahashi;Yoshinori Sekine International Journal of Electrical Power and Energy Systems 2004,
[7]
The Political Economy of Long-Term Generation Adequacy: Why an ICAP Mechanism is Needed as Part of Standard Market Design[J] Janet Gail Besser;John G. Farr;Susan F. Tierney The Electricity Journal 2002,
[8]
现代电力市场及其当量电价[M] 言茂松; 著 中国电力出版社 2008,
[9]
Supplier asset allocation in a pool-based electricity market Feng D;Gan D;Zhong J; et al; IEEE Transactions on Power Systems 2007,

