共 11 条
[1]
[2]
[3]
[4]
[5]
[7]
A hybrid simulation optimization method for production planning of dedicated remanufacturing.[J].Jianzhi Li;Miguel González;Yun Zhu.International Journal of Production Economics.2008, 2
[8]
Performance analysis of a hybrid system under quality impact of returns.[J].Hülya Behret;Aybek Korugan.Computers & Industrial Engineering.2007, 2
[9]
Performance of static priority rules for shared facilities in a remanufacturing shop with disassembly and reassembly.[J].V.Daniel R. Guide;Gilvan C. Souza;Erwin van der Laan.European Journal of Operational Research.2004, 2
[10]
Development and analysis of cost-based dispatching rules for job shop scheduling.[J].M.S Jayamohan;Chandrasekharan Rajendran.European Journal of Operational Research.2003, 2

