共 12 条
- [1] Cemented backfilling performance of yellow phosphorus slag[J]. Jia-sheng Chen 1,2),Bin Zhao 1),Xin-min Wang 1),Qin-li Zhang 1),and Li Wang 3) 1) School of Resources and Safety Engineering,Central South University,Changsha 410083,China 2) Tongling Chemical Group,Tongling 244100,China 3) College of Safety Science and Engineering,Liaoning Technical University,Fuxin 123000,China.International Journal of Minerals Metallurgy and Materials. 2010(01)
- [3] Cemented backfilling technology with unclassified tailings based on vertical sand silo[J]. 王新民,赵彬,张钦礼,徐东升.Journal of Central South University of Technology. 2008(06)
- [8] Hydraulic calculation of gravity transportation pipeline system for backfill slurry[J] . Qin-li Zhang,Guan-yu Hu,Xin-min Wang.Journal of Central South University of Technology . 2008 (5)
- [9] Stress–Strain Behaviour of Flowable Fill[J] . M. C. Nataraja,Y. Nalanda.Geotechnical and Geological Engineering . 2009 (3)
- [10] Design and Application of Underground Mine Paste Backfill Technology[J] . Tikov Belem,Mostafa Benzaazoua.Geotechnical and Geological Engineering . 2008 (2)