基于系统动力学的污水处理BOT项目特许定价

被引:29
作者
宋金波
张紫薇
机构
[1] 大连理工大学管理与经济学部
关键词
BOT; 污水处理; 特许定价; 系统动力学;
D O I
暂无
中图分类号
F283 [基本建设投资与经济效益];
学科分类号
120306 [自然资源管理];
摘要
特许定价是污水处理BOT项目特许决策的重要内容。本文采用系统动力学方法,绘制了污水处理BOT项目特许定价系统的因果关系图和系统动力学流图,应用Vensim软件进行模拟仿真,并以建设成本、运营成本、中水回用率、折现率、特许期等变量为敏感性分析参数,给出不同变量组合下特许价格的仿真结果。通过分析上述变量对特许定价的影响,为污水处理BOT项目特许定价决策提供理论参考和决策依据。
引用
收藏
页码:138 / 145
页数:8
相关论文
共 23 条
[1]
Price; capacity and concession period decisions of Pareto-efficient BOT contracts with demand uncertainty.[J].Baozhuang Niu;Jie Zhang.Transportation Research Part E.2013,
[2]
System Dynamics (SD) -based concession pricing model for PPP highway projects.[J].Yelin Xu;Chengshuang Sun;Miroslaw J. Skibniewski;Albert P.C. Chan;John F.Y. Yeung;Hu Cheng.International Journal of Project Management.2011, 2
[3]
Win–Win Concession Period Determination Methodology.[J].Xueqing Zhang.Journal of Construction Engineering and Management.2009, 6
[4]
A fuzzy simulation model for evaluating the concession items of public–private partnership schemes.[J].S. Thomas Ng;Jingzhu Xie;Martin Skitmore;Yau Kai Cheung.Automation in Construction.2007, 1
[5]
A simulation model for optimizing the concession period of public–private partnerships schemes.[J].S. Thomas Ng;Jingzhu Xie;Yau Kai Cheung;Marcus Jefferies.International Journal of Project Management.2007, 8
[6]
Effects of regulation on highway pricing and capacity choice of a build-operate-transfer scheme [J].
Subprasom, Kitti ;
Chen, Anthony .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (01) :64-71
[7]
Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects [J].
Huang, Yu-Lin ;
Chou, Shih-Pei .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (04) :379-389
[8]
Minimum feasible tariff model for BOT water supply projects in Malaysia [J].
Cheng Lianyu ;
Tiong, Robert L. K. .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (03) :255-263
[9]
A game-theoretical model of private power production [J].
Xing, W ;
Wu, FF .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2001, 23 (03) :213-218
[10]
NPV-at-risk method in infrastructure project investment evaluation [J].
Ye, SD ;
Tiong, RLK .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (03) :227-233