共 3 条
[2]
The economic lot and delivery scheduling problem: common cycle, rework, and variable production rate[J] . Moutaz Khouja.IIE Transactions . 2000 (8)
[3]
A hybrid algorithm for solving the eco-nomic lot and delivery scheduling problem in the common cyclecase .2 CLAUSEN J,JU S. European Journal of Operational Research . 2006