共 46 条
[1]
Use of Parallel Processing in Applications for Hydro Power Scheduling – Current Status and Future Challenges.[J].Geir Warland;Arild Lote Henden;Birger Mo.Energy Procedia.2016,
[2]
Optimal operation of cascade hydropower stations using hydrogen as storage medium.[J].Di Lu;Bende Wang;Yaodong Wang;Huicheng Zhou;Qiuhua Liang;Yong Peng;Tony Roskilly.Applied Energy.2015,
[3]
Long-term scheduling of large cascade hydropower stations in Jinsha River; China.[J].Chao Wang;Jianzhong Zhou;Peng Lu;Liu Yuan.Energy Conversion and Management.2015,
[4]
Optimal operation rules of Three-gorge and Gezhouba cascade hydropower stations in flood season.[J].Jie Mu;Chao Ma;Jiaqing Zhao;Jijian Lian.Energy Conversion and Management.2015,
[5]
Integrated optimization of hydroelectric energy in the upper and middle Yangtze River.[J].Jianzhong Zhou;Yongchuan Zhang;Rui Zhang;Shuo Ouyang;Xuemin Wang;Xiang Liao.Renewable and Sustainable Energy Reviews.2015,
[6]
Short-term hydro generation scheduling of Xiluodu and Xiangjiaba cascade hydropower stations using improved binary-real coded bee colony optimization algorithm.[J].Peng Lu;Jianzhong Zhou;Chao Wang;Qi Qiao;Li Mo.Energy Conversion and Management.2015,
[7]
Research on a layered coupling optimal operation model of the Three Gorges and Gezhouba cascade hydropower stations.[J].Juan Chen;Ping-an Zhong;Yun-fa Zhao.Energy Conversion and Management.2014,
[8]
Improved cuckoo search algorithm for hybrid flow shop scheduling problems to minimize makespan.[J].M.K. Marichelvam;T. Prabaharan;X.S. Yang.Applied Soft Computing Journal.2014,

