A new unit commitment method - Discussion

被引:79
作者
Li, CP
Johnson, RB
Svoboda, AJ
机构
[1] Pacific Gas and Electric Company, San Francisco, CA
关键词
D O I
10.1109/59.574930
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper introduces a new unit commitment method based on a decommittment procedure for solving the power system resource scheduling problem. From an initial schedule of all available units committed over the study period, a 'one-at-a-time' unit decommitment is accomplished by Dynamic Programming according to some specified economic criteria. The decommittment process continues until no further reduction in total cost is possible, or the unit schedules of two consecutive iterations over the time period remain unchanged without any violation of the spinning reserve constraint. Two criteria for decommitting a unit are introduced and described in detail. Comparisons of the proposed unit commitment method with the Lagrangian Relaxation (LR) approach and Fred Lee's Sequential Unit Commitment method (SUC) demonstrate the potential benefits of the proposed approach for power system operations planning. © 1996 IEEE.
引用
收藏
页码:119 / 119
页数:1
相关论文
共 20 条
[1]  
AOKI A, 1987, IEEE T PWRS, V2
[2]  
COHEN AI, 1987, IEEE T POWER SYSTEM
[3]  
DILLON, 1978, IEEE T PAS
[4]  
FERREIRA LAFM, 1989, ELECT POWER ENERGY S, V11
[5]  
FRENCH, 1989, 1989 PICA SEATTL MAY
[6]  
GORSTEN BM, 1949, EC GENERATION SCHEDU
[7]   AN OPTIMIZATION-BASED METHOD FOR UNIT COMMITMENT [J].
GUAN, X ;
LUH, PB ;
YAN, H ;
AMALFI, JA .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1992, 14 (01) :9-17
[8]  
LAUER GS, 1982, IEEE T PAS
[9]  
LEE FN, 1986, IEEE T POWER SYSTEM
[10]  
LEE FN, 1988, IEEE T POWER SYSTEM