Evaluating transmission congestion constraints in system planning

被引:51
作者
Finney, JD
Othman, HA
Rutz, WL
机构
[1] ABB Power T and D Company, Inc., Transmission Technology Institute, Raleigh
[2] ABB Power T and D Company, Inc., ABB Systems Control, Cary
关键词
D O I
10.1109/59.630454
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The formulation of a Poolco model suitable for power system planning is presented. The model involves only slight enhancement to existing conventional power system software and directly enables the calculation of spot prices and a bid-based dispatch, Included is a method for decomposing spot prices to reveal components caused by system congestion, An example illustrates how financial hedges that are traded in the Poolco scenario will affect system planning decisions.
引用
收藏
页码:1143 / 1148
页数:6
相关论文
共 12 条
[1]  
BRAUGHMAN M, 1996, 1996 IEEE WINT M BAL
[2]  
*CAL PUBL UT COMM, 1995, 9512063 CAL PUBL UT
[3]  
CARAMINIS MC, 1982, IEEE T POWER APPARAT, V101
[4]  
*FED EN REG COMM, 1995, RM958000 FED EN REG
[5]  
Fiacco A., 1983, Introduction to Sensitivity and Stability Analysis in Nonlinear Programming
[6]   OPTIMAL POWER FLOW SENSITIVITY ANALYSIS [J].
GRIBIK, PR ;
SHIRMOHAMMADI, D ;
HAO, SG ;
THOMAS, CL .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1990, 5 (03) :969-976
[7]  
HOGAN W, 1995, ELECT TRANSMISSION P
[8]   CONTRACT NETWORKS FOR ELECTRIC-POWER TRANSMISSION [J].
HOGAN, WW .
JOURNAL OF REGULATORY ECONOMICS, 1992, 4 (03) :211-242
[9]  
MUKERJI R, 1995, PROC AMER POWER CONF, V57, P1454
[10]  
Schweppe F.C., 1988, SPOT PRICING ELECT, DOI DOI 10.1007/978-1-4613-1683-1