Risk modelling in energy contracts between host utilities and BOT plant investors

被引:33
作者
David, AK
机构
[1] Hong Kong Polytechnic, Kowloon
关键词
D O I
10.1109/60.507647
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Investor owned generation is being encouraged all over the world by the current de-regulatory climate and the need to defray the heavy capital demands of plant. Contracts between the investor and the host utility determine the price of electricity and include penalties for non-delivery and compensation for failure to accept contracted energy. While it is widely appreciated that uncertainty of future conditions has an important bearing on the terms of the contract, especially in developing countries, a theoretical framework for examining these factors has not been developed. A theoretical model for linking the degree of future uncertainty, the expected production costs of the investor and the expected production cost of the host utility, with the electricity prices and penalty charges, is developed in this paper. The insight gained from these mathematical models will be useful in contractual decision making.
引用
收藏
页码:359 / 365
页数:7
相关论文
共 5 条
[1]  
GEDRA TW, 1992, IEEE WINT POW M NEW
[2]  
*GOV PHIL OFF EN A, 1988, RUL REG IMPL EX ORD
[3]  
SAMADIKUN K, 1988, 108 GOV PHIL OFF EN
[4]  
*SECR STAT EN BRIT, 1988, HER MAJ STAT OFF
[5]  
WHEELER AP, 1988, 7 INT C EL POW BRISB