Short-term resource scheduling with ramp constraints

被引:102
作者
Svoboda, AJ
Tseng, CL
Li, CA
Johnson, RB
机构
[1] Pacific Gas and Electric Company, San Francisco
关键词
D O I
10.1109/59.574926
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper describes a Lagrangian relaxation based method to solve the short-term resource scheduling (STRS) problem with ramp constraints. Instead of discretizing the generation levels, the ramp rate constraints are relaxed with the system demand constraints using Lagrange multipliers. Three kinds of ramp constraints, startup, operating and shutdown ramp constraints are considered. The proposed method has been applied to solve the hydro-thermal generation scheduling problem at PG&E. An example along with numerical results is also presented.
引用
收藏
页码:77 / 82
页数:6
相关论文
共 7 条
[1]  
Bard J., 1988, OPERATIONS RES, V36
[2]  
FERREIRA LAFM, 1989, ELECT POWER ENERGY S, V11
[3]   AN OPTIMIZATION-BASED METHOD FOR UNIT COMMITMENT [J].
GUAN, X ;
LUH, PB ;
YAN, H ;
AMALFI, JA .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1992, 14 (01) :9-17
[4]  
LI CA, UNPUB IEEE PES 1996
[5]   A CAPACITY BASED LAGRANGIAN-RELAXATION UNIT COMMITMENT WITH RAMP RATE CONSTRAINTS [J].
PETERSON, WL ;
BRAMMER, SR .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1995, 10 (02) :1077-1083
[6]  
Polyak BT., 1969, USSR COMP MATH MATH, V9, P14, DOI DOI 10.1016/0041-5553(69)90061-5
[7]   IMPLEMENTATION OF A LAGRANGIAN-RELAXATION BASED UNIT COMMITMENT PROBLEM [J].
VIRMANI, S ;
ADRIAN, EC ;
IMHOF, K ;
MUKHERJEE, S .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1989, 4 (04) :1373-1380