Negotiating price delivery date in a stochastic manufacturing environment

被引:12
作者
Elhafsi, M [1 ]
Rolland, E
机构
[1] Univ Calif Riverside, A Gary Anderson Grad Sch Management, Riverside, CA 92521 USA
[2] Ohio State Univ, Fisher Coll Business, Columbus, OH 43210 USA
关键词
D O I
10.1023/A:1007601923299
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We study a make-to-order manufacturing system consisting of several processing centers that are subject to failures and repairs. Our objective is to build a model that can be used as a tool for negotiating the delivery date and the price of a certain upcoming order. The model takes into account the congestion level of the shop floor at the time the order is placed. Based on the workload of the processing centers, the model splits the order into lots and assigns them to the processing centers so as to determine the order completion time associated with the minimum operating cost. The efficiency of the solution method for the model allows real-time decision-making while negotiating the price and delivery date of the order to be placed. Since the decisions are made based on a snapshot of the congestion level at the shop floor, using this model will reduce the conflict between the marketing and the production activities in manufacturing organizations.
引用
收藏
页码:255 / 270
页数:16
相关论文
共 22 条
[1]  
Baker K. R., 1981, J. Oper. Manage., V1, P109
[2]   A COMPARISON OF DUE-DATE SELECTION-RULES [J].
BAKER, KR ;
BERTRAND, JWM .
AIIE TRANSACTIONS, 1981, 13 (02) :123-131
[3]   SEQUENCING RULES AND DUE-DATE ASSIGNMENTS IN A JOB SHOP [J].
BAKER, KR .
MANAGEMENT SCIENCE, 1984, 30 (09) :1093-1104
[4]  
Barlow RE, 1965, MATH THEORY RELIABIL
[5]   THE EFFECT OF WORKLOAD DEPENDENT DUE-DATES ON JOB SHOP PERFORMANCE [J].
BERTRAND, JWM .
MANAGEMENT SCIENCE, 1983, 29 (07) :799-816
[6]  
Blackburn J. D., 1991, Time-based competition: the next battleground in American manufacturing
[7]  
BOOKBINDER JH, 1985, J OPER RES SOC, V36, P1017, DOI 10.1057/jors.1985.181
[8]   A SINGLE-MACHINE MODEL FOR DETERMINATION OF OPTIMAL DUE DATES AND SEQUENCE [J].
CHAND, S ;
CHHAJED, D .
OPERATIONS RESEARCH, 1992, 40 (03) :596-602
[9]   THE LESSONS OF FLOWSHOP SCHEDULING RESEARCH [J].
DUDEK, RA ;
PANWALKAR, SS ;
SMITH, ML .
OPERATIONS RESEARCH, 1992, 40 (01) :7-13
[10]   SINGLE FACILITY DUE-DATE SETTING WITH MULTIPLE CUSTOMER CLASSES [J].
DUENYAS, I .
MANAGEMENT SCIENCE, 1995, 41 (04) :608-619