Integrated project operations and personnel scheduling with multiple labour classes

被引:14
作者
Alfares, HK
Bailey, JE
Lin, WY
机构
[1] King Fahd Univ Petr & Minerals, Dhahran 31261, Saudi Arabia
[2] Arizona State Univ, Dept Ind & Management Syst Engn, Tempe, AZ 85287 USA
[3] Amer W Airlines, Phoenix, AZ 85034 USA
关键词
project scheduling; personnel scheduling; integer programming; project management;
D O I
10.1080/095372899232867
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The main theme of this paper is improving project schedules by integrating the scheduling of project jobs and labour resources. An ILP model is presented of the integrated project operations and personnel scheduling problem with multiple labour categories. Traditionally, this problem is solved in two steps: first, operations are scheduled by solving the resource-constrained project scheduling problem; then, labour categories are scheduled by solving the personnel days-off scheduling problem. The proposed model combines the two stages into an integrated problem, which is solved in one step. Using 48 test problems, the two methods were compared in terms of total cost, labour cost and scheduling efficiency. The results clearly indicate that the integrated model outperforms the traditional two-step method.
引用
收藏
页码:570 / 578
页数:9
相关论文
共 19 条
[1]  
Alfares HK, 1997, IIE TRANS, V29, P711
[2]  
ALFARES HK, 1991, THESIS ARIZONA STATE
[3]   SCHEDULING A FULL-TIME WORKFORCE TO MEET CYCLIC STAFFING REQUIREMENTS [J].
BAKER, KR .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1974, 20 (12) :1561-1568
[4]   WORKFORCE ALLOCATION IN CYCLICAL SCHEDULING PROBLEMS - SURVEY [J].
BAKER, KR .
OPERATIONAL RESEARCH QUARTERLY, 1976, 27 (01) :155-167
[5]  
BEDWORTH DD, 1987, INTEGRATED PRODUCTIO, P387
[6]  
BROWNE JJ, 1975, IND ENG, V7, P22
[7]  
Davis EW, 1973, AIIE Transactions, V5, P297
[8]   MULTIPROJECT STAFF SCHEDULING WITH VARIABLE RESOURCE CONSTRAINTS [J].
DEAN, BV ;
DENZLER, DR ;
WATKINS, JJ .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1992, 39 (01) :59-72
[9]  
ELMAGHRABY SE, 1977, ACTIVITY NETWORKS PR, P173
[10]  
HIROAKA T, 1980, B JAPANESE SOC MECH, V23, P1929