Integral Lifting and Seismic Isolation Retrofit of Great Hall of Nanjing Museum

被引:19
作者
Guo, Tong [1 ]
Wu, Erjun [2 ]
Li, Aiqun [3 ]
Wei, Longwu [4 ]
Li, Xingping [3 ]
机构
[1] Southeast Univ, Minist Educ, Key Lab Concrete & Prestressed Concrete Struct, Nanjing 210096, Jiangsu, Peoples R China
[2] Hohai Univ, Sch Civil Engn, Nanjing 210098, Jiangsu, Peoples R China
[3] Southeast Univ, Sch Civil Engn, Nanjing 210096, Jiangsu, Peoples R China
[4] Jiangsu Hongji Sci Technol Co Ltd, Engn, Nanjing 210018, Peoples R China
关键词
Integral lifting; Seismic isolation; Underpinning; Lifting control system; Laminated rubber isolator;
D O I
10.1061/(ASCE)CF.1943-5509.0000273
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents the integral lifting and seismic isolation retrofit of the great hall of Nanjing Museum, a 78-year-old cultural and historical building. Due to the need for extension, the great hall of the Nanjing Museum needed to be lifted 3.0 m. The total building area for lifting was 4; 830 m(2), with a total of 161 lifting points, which made this project quite challenging and also the largest done to date. Moreover, seismic isolation retrofit was utilized to improve the seismic performance of the translocated building. Details of the integral lifting and the seismic retrofit are presented in this paper, which include (1) the load underpinning system, (2) the spatial strengthening truss system, (3) the lifting control system, and (4) the base isolation using laminated rubber isolators. The entire lifting system performed well, and the main construction was finished within 5 months. Seismic time-history analyses were further performed to evaluate the effect of the seismic isolation. It was observed that the seismic responses of the museum were significantly reduced after retrofit. DOI: 10.1061/(ASCE)CF.1943-5509.0000273. (C) 2012 American Society of Civil Engineers.
引用
收藏
页码:558 / 566
页数:9
相关论文
共 14 条
[1]  
Anders J., 2000, STRUCT MOVER, V18, P50
[2]  
CSI, 2007, CSI Analysis Reference Manual for SAP2000
[3]  
Kelly J M., 1998, Base Isolation: Origins and Development
[4]  
Kennedy H., 2003, STRUCT MOVERS, V21, P10
[5]  
Kenward J, 2006, STRUCT ENG, V84, P39
[6]  
Li X. P., 2011, THESIS SE U NANJING
[7]  
Liu W. Q., 2009, SEISMIC ANAL ISOLATI
[8]   Seismic isolation retrofit of large historic building [J].
Mokha, AS ;
Amin, N ;
Constantinou, MC ;
Zayas, V .
JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1996, 122 (03) :298-308
[9]  
Nanjing Univ. of Technology, 2004, JGZD04002 NANJ U TEC
[10]   LIFT SYSTEM FOR RAISING CONTINUOUS CONCRETE BRIDGES [J].
RAMEY, GE .
JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 1983, 109 (05) :733-746