Review of condition assessment of power transformers in service

被引:638
作者
Wang, M [1 ]
Vandermaar, AJ
Srivastava, KD
机构
[1] Powertech Labs Inc, Surrey, BC, Canada
[2] Univ British Columbia, Vancouver, BC V5Z 1M9, Canada
关键词
transformer insulation; condition assessment; failure statistics; oil testing; dissolved gas analysis; partial discharge (PD); power factor; dielectric spectroscopy; recovery voltage; winding movement detection;
D O I
10.1109/MEI.2002.1161455
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
A review of condition assessment of power transformers in service was presented. The repair and replacement of a 345/138 kV transformer required about 12 to 15 months. It was shown that the aging of paper insulation determined the ultimate life of the transformer.
引用
收藏
页码:12 / 25
页数:14
相关论文
共 104 条
[1]  
AGOU S, 2000, ELECT TODAY, V12, P22
[2]  
ALKHAYAT N, 1995, P EL EL INS C CHIC I
[3]  
[Anonymous], ELECT TODAY
[4]  
[Anonymous], INT COUNC LARG EL SY
[5]  
ASCHWANDEN TH, 1998, INT COUNC LARG EL SY
[6]  
Basak A., 1999, Engineering Science and Education Journal, V8, P41, DOI 10.1049/esej:19990107
[7]  
Belanger M., 1999, ELECT TODAY, V11, P19
[8]   Status and trends in transformer monitoring [J].
Bengtsson, C .
IEEE TRANSACTIONS ON POWER DELIVERY, 1996, 11 (03) :1379-1384
[9]  
BENGTSSON T, 1996, INT COUNC LARG EL SY
[10]  
BLACKBURN TR, 1998, INT S EL INS MAT TOY