The SRTM data "finishing" process and products

被引:133
作者
Slater, JA
Garvey, G
Johnston, C
Haase, J
Heady, B
Kroenung, G
Little, J
机构
关键词
Space research;
D O I
10.14358/PERS.72.3.237
中图分类号
P9 [自然地理学];
学科分类号
0705 ; 070501 ;
摘要
The Shuttle Radar Topography Mission (SRTM) successfully acquired terrain elevation data for 80 percent of the Earth's landmass in February 2000. The radar system and data collection scheme designed by NASA's jet Propulsion Laboratory (JPL) met the global requirements of the U.S. Department of Defense for Level 2 Digital Terrain Elevation Data (DTED (R)). JPL processed the raw data into unfinished DTED (R) 2 and other products that were delivered to two contractors of the National Geospatial-Intelligence Agency. The contractors edited the unfinished DTED (R) 2, updated the associated products, and generated finished products for distribution. Automated processes were developed by each contractor to identify, delineate and set heights for lakes, rivers, and ocean coastlines in conformance with an extensive set of editing rules created to maintain consistency and uniformity in the final products. The finished DTED (R) is significantly better than the 16 m vertical accuracy required by the original specification.
引用
收藏
页码:237 / 247
页数:11
相关论文
共 10 条
[1]  
Esri E, 1998, ESRI SHAP TECHN DESC
[2]  
Farr TG., 2000, AM GEOPHYS UNION EOS, V81, P583, DOI [10.1029/EO081i048p00583, DOI 10.1029/EO081I048P00583]
[3]  
*NIMA, 2003, SRTM WAT BOD DAT PRO
[4]  
*NIMA, 2001, SHUTTL RAD TOP MISS
[5]  
*NIMA, 2003, SRTM DAT ED RUL VERS
[6]  
NIMA (National Imagery and Mapping Agency), 2000, MILPRF89020B NIMA
[7]  
NORDSTROM KN, 1990, IMAGE VISION COMPUT, V8, P318, DOI 10.1016/0262-8856(90)80008-H
[8]  
RODRIGUEZ E, 2004, D31639 NASA JET PROP
[9]  
SALAMONOWICZ P, 2003, P 2003 ASPRS C 05 09
[10]  
SONKA M, 1993, IMAGE PROCESSING ANA, P118