Day-ahead market energy and reserve scheduling;
ramping capability;
wind power uncertainty;
ROBUST UNIT COMMITMENT;
GENERATION;
SECURITY;
D O I:
10.1109/TSG.2016.2572639
中图分类号:
TM [电工技术];
TN [电子技术、通信技术];
学科分类号:
080906 [电磁信息功能材料与结构];
082806 [农业信息与电气工程];
摘要:
This paper presents an adjustable interval optimization model for the energy and reserve clearance while treating the wind power variation and uncertainty. Instead of conventional predicted intervals (PIs), adjustable intervals (AIs) as subsets of PIs are proposed as more judicious choices for economically covering wind uncertainties. Ramp-capability reserve is modeled to ensure the existence of sufficient ramp capability needed to follow up wind power variation within AIs. However, realization of wind power beyond AIs, which is no longer compensable by ramp-capability reserve, would necessarily lead to either load shedding or wind spillage. In order to optimally determine AIs, apart from the energy and reserve procurement costs, the costs associated with load shedding and wind spillage are incorporated in the objective function. The confidence level theory is employed as well for tuning the robustness and conservatism of the final solution. Performance of the proposed method is examined on several case studies on an 8-bus and modified IEEE 118-bus test systems. Sensitivity analyses are conducted to specify the impacts of important parameters on the obtained solution. The results confirm the applicability and effectiveness of the proposed methodology.
引用
收藏
页码:2943 / 2952
页数:10
相关论文
共 29 条
[1]
[Anonymous], 2001, Probability, Random Variables and Stochastic Processes
[2]
[Anonymous], 2007, Pac. J. Optim., DOI DOI 10.18452/2928