Project management duration resource tradeoff analysis: An application of the cut search approach

被引:8
作者
Phillips, S
机构
[1] Georgia College, University System of Georgia
关键词
CPM; networks; PERT; project management;
D O I
10.1057/jors.1996.81
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The paper presents an application oriented procedure for solving the project management duration/resource tradeoff problem. A procedure is presented for reducing a project from a normal to a crash duration state at a minimum amount of additional resource expenditure assuming a linear utilization functions. The procedure is network based using a graphical Cut Search Approach to locate the minimal resource level at each reduction in total project duration. Activity-on-are networks and how networks are utilized. The paper is presented for practical application and for conceptual development as compared to a theoretical treatment.
引用
收藏
页码:697 / 701
页数:5
相关论文
共 5 条
[1]  
Elmaghraby S.E., 1977, Activity Networks: Project Planning and Control by Network Models
[2]   A NETWORK FLOW COMPUTATION FOR PROJECT COST CURVES [J].
FULKERSON, DR .
MANAGEMENT SCIENCE, 1961, 7 (02) :167-178
[3]   CUT SEARCH ALGORITHM WITH ARC CAPACITIES AND LOWER BOUNDS [J].
PHILLIPS, S ;
DESSOUKY, MI .
MANAGEMENT SCIENCE, 1979, 25 (04) :396-404
[4]   SOLVING PROJECT TIME-COST TRADEOFF PROBLEM USING MINIMAL CUT CONCEPT [J].
PHILLIPS, S ;
DESSOUKY, MI .
MANAGEMENT SCIENCE, 1977, 24 (04) :393-400
[5]   MINIMAL COST PROJECT NETWORKS - THE CUT SET PARALLEL DIFFERENCE METHOD [J].
WU, Y ;
LI, C .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1994, 22 (04) :401-407