An efficient heuristic approach to recognize the infeasibility of a loading problem

被引:9
作者
Hsu, VN [1 ]
DeMatta, R [1 ]
机构
[1] UNIV IOWA,COLL BUSINESS ADM,DEPT MANAGEMENT SCI,IOWA CITY,IA 52242
来源
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS | 1997年 / 9卷 / 01期
关键词
hierarchical production planning; FMS loading; Lagrangian relaxation;
D O I
10.1023/A:1007925809798
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The success of hierarchical production planning approaches for flexible manufacturing systems lies in the consistency of decision outcomes at various decision levels. For instance, the loading problem, which is solved at a lower level, may not yield a feasible loading solution to a set of part types selected at a higher level. This paper attempts to address the issue of recognizing the infeasibility of a loading solution. We present a modified loading model that includes a penalty for each operation not assigned to any machine. We develop a Lagrangian-based heuristic procedure and provide a sufficient condition on the quality of heuristic solutions that, if satisfied, will enable us to use the heuristic solutions to recognize the infeasibility of a loading problem. The proposed model and the dual-based heuristic can be effectively incorporated in an FMS hierarchical production planning approach that finds a good loading solution by iteratively comparing different part grouping scenarios.
引用
收藏
页码:31 / 49
页数:19
相关论文
共 35 条
[1]  
AFENTAKIS P, 1989, 3RD P ORSA TIMS C FL, P141
[2]  
AMMONS JC, 1985, ANN OPER RES, V3, P319
[3]   A BRANCH AND BOUND APPROACH FOR MACHINE LOAD BALANCING IN FLEXIBLE MANUFACTURING SYSTEMS [J].
BERRADA, M ;
STECKE, KE .
MANAGEMENT SCIENCE, 1986, 32 (10) :1316-1335
[4]  
Carey M., 1979, COMPUTER INTRACTABIL
[5]  
CHAKRAVARTY AK, 1984, 1ST P ORSA TIMS C FM, P284
[6]   RATIONALIZING TOOL SELECTION IN A FLEXIBLE MANUFACTURING SYSTEM FOR SHEET-METAL PRODUCTS [J].
DASKIN, M ;
JONES, PC ;
LOWE, TJ .
OPERATIONS RESEARCH, 1990, 38 (06) :1104-1115
[7]  
Denizel-Sivri M., 1993, Production and Operations Management, V2, P289, DOI 10.1111/j.1937-5956.1993.tb00104.x
[8]   DUAL-BASED PROCEDURE FOR UNCAPACITATED FACILITY LOCATION [J].
ERLENKOTTER, D .
OPERATIONS RESEARCH, 1978, 26 (06) :992-1009
[9]   ALGORITHMUS 47 - AN ALGORITHM FOR THE SOLUTION OF THE 0-1 KNAPSACK-PROBLEM [J].
FAYARD, D ;
PLATEAU, G .
COMPUTING, 1982, 28 (03) :269-287
[10]   THE LAGRANGIAN-RELAXATION METHOD FOR SOLVING INTEGER PROGRAMMING-PROBLEMS [J].
FISHER, ML .
MANAGEMENT SCIENCE, 1981, 27 (01) :1-18