共 14 条
- [1] BRUSCIA GM, 1997, P 1997 7 ANN ISA POW, V40, P1
- [2] COMBINING FUEL-CELLS WITH FUEL-FIRED POWER-PLANTS FOR IMPROVED EXERGY EFFICIENCY [J]. ENERGY, 1991, 16 (10) : 1259 - 1274
- [4] FIRST-LAW AND 2ND-LAW ANALYSIS OF STEAM-TURBINE COGENERATION SYSTEMS [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 1994, 116 (01): : 15 - 19
- [5] HABIB MA, 1990, FUNDAMENTALS THERMOD, V19, P29
- [6] PERFORMANCE EVALUATION OF SELECTED COMBUSTION GAS-TURBINE COGENERATION SYSTEMS BASED ON 1ST-LAW AND 2ND-LAW ANALYSIS [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 1990, 112 (01): : 117 - 121
- [7] MCWHIRLER JD, 1997, POWER ENG, V101, P44
- [8] McWhirter JD, 1997, POWER ENG, V101, P41
- [9] MORAN MJ, 1982, AVAILABILITY ANAL GU, P155
- [10] MORAN MJ, 1988, FUNDAMENTALS ENG