A model for inbound supply risk analysis

被引:254
作者
Wu, T
Backhurst, J
Chidambaram, V
机构
[1] Iowa State Univ Sci & Technol, Dept Logist Operat & MIS, Ames, IA 50011 USA
[2] Arizona State Univ, Dept Ind Engn, Tempe, AZ 85287 USA
关键词
analytical hierarchy process (AHP); inbound supply risk analysis; prototype implementation;
D O I
10.1016/j.compind.2005.11.001
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Managing risk has become a critical component of supply chain management. The implications of supply chain failures can be costly and lead to significant customer delivery delays. Though, different types of supply chain vulnerability management methodologies have been proposed for managing supply risk, most offer only point-based solutions that deal with a limited set of risks. This research aims to reinforce inbound supply chain risk management by proposing an integrated methodology to classify, manage and assess inbound supply risks. The contributions of this paper are four-fold: (1) inbound supply risk factors are identified through both an extensive academic literature review on supply risk literature review as well as a series of industry interviews; (2) from these factors, a hierarchical risk factor classification structure is created; (3) an analytical hierarchy processing (AHP) method with enhanced consistency to rank risk factor for suppliers is created; and (4) a prototype computer implementation system is developed and tested on an industry example. (c) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:350 / 365
页数:16
相关论文
共 46 条
[1]  
[Anonymous], 2002, SUPPLY CHAIN MANAGEM
[2]  
[Anonymous], 2001, MANUFACTURING OPERAT
[3]  
[Anonymous], J OPERATIONS MANAGEM
[4]  
CHAN F, 1996, INTEGRATED MANUFACTU, V7
[5]  
Chapman C., 1996, PROJECT RISK MANAGEM
[6]  
CHIDAMBARAM V, 2003, THESIS ARIZONA STATE
[7]  
Conrow E. H., 2000, EFFECTIVE RISK MANAG
[8]  
Cooke J., 2002, Logistics Management and Distribution Report, V41, P31
[9]   Decision support system for inspection and maintenance: A case study of oil pipelines [J].
Dey, PK .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2004, 51 (01) :47-56
[10]  
Dickson G.W., 1966, Journal of Purchasing, V2, P5, DOI [10.1111/j.1745-493x.1966.tb00818.x, DOI 10.1111/J.1745-493X.1966.TB00818.X, 10.1111/j.1745-493X.1966.tb00818.x]