Impact of change orders on labor efficiency for mechanical construction

被引:79
作者
Hanna, AS [1 ]
Russell, JS [1 ]
Gotzion, TW [1 ]
Nordheim, EV [1 ]
机构
[1] Univ Wisconsin, Dept Civil & Environm Engn, Madison, WI 53706 USA
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1999年 / 125卷 / 03期
关键词
D O I
10.1061/(ASCE)0733-9364(1999)125:3(176)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Change orders have become an everyday occurrence in construction. It is widely accepted by both owners and contractors that change orders have an effect on the labor efficiency, but these effects are difficult to quantify and frequently lead to disputes. Data from 61 mechanical construction projects were collected to develop a statistical model that estimates the actual amount of labor efficiency lost due to the change orders. The input variables needed in the model are as follows: (1) The original estimated labor hours; (2) impact classification; (3) total estimated change hours; (4) number of change orders; and (5) the timing of changes. The results of this study show that impacted projects have a larger decrease in labor efficiency than unimpacted projects. Additionally, the later a change order occurs in the life of a project the more impact it will have on the labor efficiency. The results appear to be consistent with the intuition of experienced professionals. Although each project has unique characteristics, the resultant model provides owners and contractors with a baseline measure of lost labor efficiency.
引用
收藏
页码:176 / 184
页数:9