Supply chain reengineering using a core process analysis matrix and object-oriented simulation

被引:37
作者
Changchien, SW [1 ]
Shen, HY [1 ]
机构
[1] Chaoyang Univ Technol, Dept Informat Management, Taichung, Taiwan
关键词
supply chain management; business process reengineering; strategic alliances; object-oriented simulation;
D O I
10.1016/S0378-7206(01)00102-1
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
To satisfy and respond quickly to customers' demand, many companies are now aggressively focusing on supply chain management in order to strengthen their competitiveness. This paper proposes an integrated business process reengineering (BPR) framework for improving performance. There are several steps in this framework: creating vision, identifying core processes to be redesigned, analyzing current core processes, designing for innovation, evaluating the new processes, selecting the best, and transforming and implementing the resulting design. A core process analysis matrix is proposed for identifying the critical processes. System simulation is useful in measuring the performance and predicting the effect of change on the system. To reduce the risk of BPR, an object-oriented simulation framework is developed for evaluating and analyzing the reengineering proposals. This paper uses a case study to show the value of the method. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:345 / 358
页数:14
相关论文
共 30 条
[1]   Structural Changes in the Supply Chain [J].
Abrahamsson, Mats ;
Brege, Staffan .
NEW ZEALAND JOURNAL OF CROP AND HORTICULTURAL SCIENCE, 2019, 47 (04) :35-44
[2]  
[Anonymous], UML TOOLKIT
[3]  
Banks J., 2009, DISCRETE EVENT SYSTE, V5th
[4]   Supply Chain Management: A Strategic Perspective [J].
Bechtel, Christian ;
Jayaram, Jayanth .
NEW ZEALAND JOURNAL OF CROP AND HORTICULTURAL SCIENCE, 2019, 47 (04) :15-34
[5]   BUSINESS PROCESS REENGINEERING AN ELECTRONIC PRODUCTS SUPPLY CHAIN [J].
BERRY, D ;
NAIM, MM ;
TOWILL, DR .
IEE PROCEEDINGS-SCIENCE MEASUREMENT AND TECHNOLOGY, 1995, 142 (05) :395-403
[6]  
Burgess R., 1998, INT J LOGIST MANAG, V9, P15
[7]  
Clark T. H., 1997, International Journal of Electronic Commerce, V2, P7
[8]  
Cooper M. C., 1997, INT J LOGIST MANAG, V8, P1, DOI [10.1108/09574099710805556, DOI 10.1108/09574099710805556]
[9]  
DAVENPORT TH, 1990, SLOAN MANAGE REV, V31, P11
[10]   BUSINESS PROCESS REENGINEERING THE SUPPLY CHAIN [J].
EVANS, GN ;
TOWILL, DR ;
NAIM, MM .
PRODUCTION PLANNING & CONTROL, 1995, 6 (03) :227-237