Pre-feasibility study of wind power generation in holyrood, newfoundland

被引:21
作者
Blackler, T [1 ]
Iqbal, MT [1 ]
机构
[1] Mem Univ Newfoundland, Fac Engn & Appl Sci, St John, NF A1B 3X5, Canada
关键词
D O I
10.1016/j.renene.2005.04.009
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The largest commercial thermal generating plant in Newfoundland is in Holyrood, Conception Bay. It has a generating capacity of 500 MW of electricity. During peak generation (winter months), the plant runs at near capacity with generation reaching as high as 500 MW. In addition to thermal generation about 900 MW is supplied to the grid by a number of hydro plants. This paper presents a pre-feasibility study of 25% of thermal power generation using wind turbines in the Holyrood area. Purpose of supplementing power generation from the thermal plant is to reduce emissions and fuel costs. Simulation results indicate that 16 Enercon's E-66, 2 MW wind turbines if installed near the site will provide a 25% renewable fraction. Supplementing 25% of the generation at Holyrood with wind power will reduce the cost of energy by CA$0.013/kWh. It will also reduce carbon emissions by almost 200,000 tons/year. This study indicates that a wind farm project at the Holyrood thermal generation station site is feasible. (c) 2005 Elsevier Ltd. All rights reserved.
引用
收藏
页码:489 / 502
页数:14
相关论文
共 9 条
[1]  
[Anonymous], 2005, NASA SURFACE METEORO
[2]  
BLANCO G, 2002, AWEA WIND POW 2002 C
[3]   Feasibility study of wind energy potential in China [J].
Han, YH ;
Mays, I .
RENEWABLE ENERGY, 1996, 9 (1-4) :810-814
[4]  
Johnson GL., 2001, WIND ENERGY SYSTEMS
[5]   Wind energy resource map of Newfoundland [J].
Khan, MJ ;
Iqbal, MT .
RENEWABLE ENERGY, 2004, 29 (08) :1211-1221
[6]  
Manwell J.F., 2002, WIND ENERGY EXPLAINE
[7]  
Shaahid S. M., 2004, Wind Engineering, V28, P621, DOI 10.1260/0309524043028127
[8]  
TOWNSEND B, 2002, P IEEE POW ENG SOC T, V3, P1429
[9]  
2005, CANADIAN CLIMATE NOR