Integrated Environmental Risk Assessment and Whole-Process Management System in Chemical Industry Parks

被引:32
作者
Shao, Chaofeng [1 ]
Yang, Juan [1 ]
Tian, Xiaogang [2 ]
Ju, Meiting [1 ]
Huang, Lei [1 ]
机构
[1] Nankai Univ, Coll Environm Sci & Engn, Tianjin 300071, Peoples R China
[2] Sichuan Inst Sci & Technol Environm Protect, Chengdu 610041, Peoples R China
关键词
environmental risk assessment; risk zoning; environmental risk management; chemical industry parks; Tianjin Binhai New Area; HAZARDOUS SUBSTANCES; VULNERABILITY;
D O I
10.3390/ijerph10041609
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Chemical industry parks in China are considered high-risk areas because they present numerous risks that can damage the environment, such as pollution incidents. In order to identify the environmental risks and the principal risk factors in these areas, we have developed a simple physical model of a regional environmental risk field (ERF) using existing dispersal patterns and migration models. The regional ERF zoning was also conducted and a reference value for diagnostic methods was developed to determine risk-acceptable, risk-warning, and risk-mitigation zones, which can provide a risk source layout for chemical industry parks. In accordance with the environmental risk control requirements, this study focused on the three stages of control and management of environmental risk and established an environmental risk management system including risk source identification and assessment, environmental safety planning, early risk warning, emergency management, assessment of environmental effects, and environmental remediation of pollution accidents. By using this model, the environmental risks in Tianjin Binhai New Area, the largest chemical industry park in China, were assessed and the environmental risk zoning map was drawn, which suggested the existence of many unacceptable environmental risks in this area. Thus, relevant suggestions have been proposed from the perspective of the adjustment of risk source layout, intensified management of environmental risk control and so on.
引用
收藏
页码:1609 / 1630
页数:22
相关论文
共 32 条
[1]  
[Anonymous], [No title captured]
[2]  
[Anonymous], 2003, GUID PRINC CHEM ACC
[3]  
[Anonymous], [No title captured]
[4]  
[Anonymous], [No title captured]
[5]  
[Anonymous], [No title captured]
[6]   Design optimization of hazardous substance storage facilities to minimize project risk [J].
Bernechea, Esteban J. ;
Arnaldos Viger, Josep .
SAFETY SCIENCE, 2013, 51 (01) :49-62
[7]  
Bi J., 2006, REGIONAL ENV RISK AN, P25
[8]   Appraising the flammability hazards of hydrocarbon refrigerants using quantitative risk assessment model Part I: modelling approach [J].
Colbourne, D ;
Suen, KO .
INTERNATIONAL JOURNAL OF REFRIGERATION-REVUE INTERNATIONALE DU FROID, 2004, 27 (07) :774-783
[9]  
COVO Commission, 1981, RISK AN 6 POT HAZ IN
[10]  
Crossthwaite PJ., 1988, ICHEME S SERIES, V110, P373