Mixed assembly and disassembly operations for remanufacturing

被引:55
作者
Ketzenberg, ME
Souza, GC
Guide, VDR
机构
[1] Colorado State Univ, Coll Business, Ft Collins, CO 80523 USA
[2] Univ Maryland, Robert H Smith Sch Business, College Pk, MD 20742 USA
[3] Penn State Univ, Smeal Coll Business Adm, University Pk, PA 16802 USA
关键词
remanufacturing; assembly lines; queuing; simulation;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 [工学];
摘要
In this paper we consider the problem of designing a mixed assembly-disassembly line for remanufacturing. That is, parts from the disassembly and repair of used products can be used to build "new" products. This is a problem common to many OEM remanufacturers, such as Xerox or Kodak. We study two main configurations, under the assumption that the disassembly sequence is exactly the reverse of the assembly sequence. Under a parallel configuration, there exist two separate dedicated lines, one for assembly and one for disassembly, which are decoupled by buffers-from both disassembly operations, which have preference, as well as parts from an outside, perfectly reliable supplier. Under a mixed configuration, the same station is used for both disassembly and assembly of a specific part. The problem is studied using G1/G/c networks, as well as simulation. Due to a loss of pooling, we conclude that the parallel configuration outperforms the mixed line only when the variability of both arrivals and processing time are significantly higher for disassembly and remanufacturing than for assembly. Via a simulation, we explore the impact of having advanced yield information for the remanufacturing parts. We find that advanced yield information generally improves flow times; however, there are some instances where it lengthens flow times.
引用
收藏
页码:320 / 335
页数:16
相关论文
共 22 条
[1]
[Anonymous], J IND ECOLOGY, DOI DOI 10.1162/jiec.1998.2.2.89
[2]
[Anonymous], 1990, Assembly Line Design
[3]
Bitran G. R., 1996, Production and Operations Management, V5, P163, DOI 10.1111/j.1937-5956.1996.tb00392.x
[4]
Buzacott J.A., 1993, STOCHASTIC MODELS MA
[5]
FERRER G, 2001, VALUE INFORMATION RE
[6]
Fleischmann M., 2001, LECT NOTES EC MATH S, V501
[7]
GEYER R, 2000, 200034TMCISMO12 INSE
[8]
Guide VDR, 1998, J OPER MANAG, V16, P551, DOI 10.1016/S0272-6963(97)00024-7
[9]
Guide VDR, 2001, PROD OPER MANAG, V10, P142
[10]
Production planning and control for remanufacturing: a state-of-the-art survey [J].
Guide, VDR ;
Jayaraman, V ;
Srivastava, R .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 1999, 15 (03) :221-230