A simple linear heuristic for the service constrained random yield problem

被引:12
作者
Bassok, Y [1 ]
Hopp, WJ
Rohatgi, M
机构
[1] Univ So Calif, Marshall Sch Business, Dept Informat & Management Sci, Los Angeles, CA 90089 USA
[2] Northwestern Univ, Dept Ind Engn & Management Sci, Evanston, IL 60208 USA
关键词
D O I
10.1080/07408170208928884
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider the problem of setting order quantities for purchased components subject to uncertainty in the delivery amounts. Assuming the periodic production volumes (demands) to be known and constant, we model this as a random yield problem with the objective of minimizing average inventory cost subject to a service level constraint over the infinite horizon. We first demonstrate that under conditions of random yield, conventional definitions of service can be inappropriate. Then we refine the definition of service for random yield cases and use this to formulate an optimization model. Exact solution of this model proves to be computationally impractical and, as we show, the common heuristic of inflating demands by a constant proportion is not robustly accurate. Therefore, we develop a new heuristic, which we term the linear inflation policy, that specifies a linear function for the inflation factors. Numerical tests indicate that this heuristic can substantially outperform the traditional constant inflation policy and works well relative to a lower bound on the optimal solution on a range of examples.
引用
收藏
页码:479 / 487
页数:9
相关论文
共 10 条
[1]  
Arrow K.J., 1958, Studies in the Mathematical Theory of Inventory and Production
[2]  
BASSOK Y, 1994, SINGLE STAGE PRODUCT
[3]   Myopic heuristics for the random yield problem [J].
Bollapragada, S ;
Morton, TE .
OPERATIONS RESEARCH, 1999, 47 (05) :713-722
[4]  
Chen GZ, 1996, JSAEM APPL ELECTROM, V5, P1
[5]   LOT-SIZING IN ASSEMBLY SYSTEMS WITH RANDOM COMPONENT YIELDS [J].
GERCHAK, Y ;
WANG, YZ ;
YANO, CA .
IIE TRANSACTIONS, 1994, 26 (02) :19-24
[6]   PERIODIC REVIEW PRODUCTION MODELS WITH VARIABLE YIELD AND UNCERTAIN DEMAND [J].
GERCHAK, Y ;
VICKSON, RG ;
PARLAR, M .
IIE TRANSACTIONS, 1988, 20 (02) :144-150
[7]   THE STRUCTURE OF PERIODIC REVIEW POLICIES IN THE PRESENCE OF RANDOM YIELD [J].
HENIG, M ;
GERCHAK, Y .
OPERATIONS RESEARCH, 1990, 38 (04) :634-643
[8]   THE FINITE-HORIZON NONSTATIONARY STOCHASTIC INVENTORY PROBLEM - NEAR-MYOPIC BOUNDS, HEURISTICS, TESTING [J].
MORTON, TE ;
PENTICO, DW .
MANAGEMENT SCIENCE, 1995, 41 (02) :334-343
[9]  
NAHMIAS S, 1997, PRODUCTION OPERATION, P289
[10]   OPTIMAL RUN QUANTITIES FOR AN ASSEMBLY SYSTEM WITH RANDOM YIELDS [J].
YAO, DD .
IIE TRANSACTIONS, 1988, 20 (04) :399-403