Simplified spreadsheet solutions. II: Overall schedule optimization

被引:40
作者
Hegazy, T [1 ]
Ersahin, T
机构
[1] Univ Waterloo, Dept Civil Engn, Waterloo, ON N2L 3G1, Canada
[2] Revay & Associates Ltd, Toronto, ON M2J 4V8, Canada
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 2001年 / 127卷 / 06期
关键词
D O I
10.1061/(ASCE)0733-9364(2001)127:6(469)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Overall schedule optimization, considering, time, cost, and resource constraints is a difficult task due to the inherent complexity of projects, the difficulties associated with modeling all aspects combined, and the inability of traditional optimization tools to solve this large-size problem. In this paper, a practical approach is presented for the modeling and optimization, of overall construction schedules. To simplify modeling, a spreadsheet-based model is developed to be easily usable by practitioners. The spreadsheet model integrates critical-path network scheduling with time-cost trade-off analysis, resource allocation, resource leveling, and cash flow management. The model uses the total project cost as the objective function to be minimized. To facilitate this large-size optimization, a nontraditional optimization technique, genetic algorithms, is used to locate the globally optimal solution, considering all aspects simultaneously. Details of the proposed model are described, and a hypothetical case study was used to experiment with it. Integration of the model with a simple information system is described to automate the development of optimal construction schedules.
引用
收藏
页码:469 / 475
页数:7
相关论文
共 12 条
[1]  
[Anonymous], 1989, GENETIC ALGORITHM SE
[2]  
[Anonymous], 2001, An introduction to genetic algorithms
[3]  
CHAN W, 1996, J CONSTR ENG M ASCE, V112, P125
[4]   Simplified spreadsheet solutions. I: Subcontractor information system [J].
Hegazy, T ;
Ersahin, T .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (06) :461-468
[5]  
Hegazy T., 1999, Cost Engineering, V41, P26
[6]  
Karshenas S., 1990, J CONSTRUCTION MANAG, V8, P135, DOI DOI 10.1080/01446199000000012
[7]   GENETIC ALGORITHMS IN DISCRETE OPTIMIZATION OF STEEL TRUSS ROOFS [J].
KOUMOUSIS, VK ;
GEORGIOU, PG .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1994, 8 (03) :309-325
[8]   Using improved genetic algorithms to facilitate time-cost optimization [J].
Li, H ;
Love, P .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1997, 123 (03) :233-237
[9]   New approach for optimization of overall construction schedule [J].
Li, SR .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (01) :7-13
[10]  
*MICR CORP, 1997, EXC REF MAN