Plausible responses to the threat of rapid sea-level rise in the Thames Estuary

被引:44
作者
Lonsdale, K. G. [1 ]
Downing, T. E. [1 ]
Nicholls, R. J. [2 ,3 ]
Parker, D. [4 ]
Vafeidis, A. T. [4 ]
Dawson, R. [5 ,6 ]
Hall, J. [5 ,6 ]
机构
[1] Stockholm Environm Inst, Oxford OX2 7DL, England
[2] Univ Southampton, Sch Civil Engn, Southampton SO17 1BJ, Hants, England
[3] Univ Southampton, Environm & Tyndall Ctr Climate Change Res, Southampton SO17 1BJ, Hants, England
[4] Middlesex Univ, Flood Hazard Res Ctr, Enfield EN3 4SA, Middx, England
[5] Newcastle Univ, Sch Civil Engn & Geosci, Newcastle Upon Tyne NE1 7RU, Tyne & Wear, England
[6] Newcastle Univ, Tyndall Ctr Climate Change Res, Newcastle Upon Tyne NE1 7RU, Tyne & Wear, England
基金
英国自然环境研究理事会;
关键词
D O I
10.1007/s10584-008-9483-0
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper considers the perceptions and responses of selected stakeholders to a very low probability but high consequence climatic 'surprise' - a scenario of rapid collapse of the West Antarctic ice sheet, producing a global rise in sea-level of 5 m over 100 years. It uses a case study of the Thames Estuary, UK, including London. Through a process of dialogue involving one-to-one interviews and a 1-day policy exercise, we addressed influences on decision-making when information is uncertain and our ability to plan, prepare for and implement effective ways of coping with this extreme scenario. The interviews and policy exercise explored plausible responses to the scenario and identified weaknesses in flood management approaches to dealing with such an occurrence. The analysis shows that an extreme scenario could be highly challenging, even for an area with well-developed institutions. Participants favoured two options (a) reconfiguring London around the rising water, and (b) building a new downstream barrier which would allow London to continue as today. The lack of consensus suggests the potential for policy paralysis in response to what is a highly uncertain phenomena-this could lead to a forced, unplanned response as the rapid change overwhelmed the existing defence capability. Hence, low probability, high consequence climatic events may challenge our existing institutions. Adaptive management is presented as an approach which could address this challenge.
引用
收藏
页码:145 / 169
页数:25
相关论文
共 54 条
[1]  
Adger WN, 2007, AR4 CLIMATE CHANGE 2007: IMPACTS, ADAPTATION, AND VULNERABILITY, P717
[2]  
[Anonymous], 2002, CLIMATE CHANGE SCENA
[3]  
[Anonymous], IND ENV CRISIS Q, DOI DOI 10.1177/108602669600900403
[4]  
*ASS BRIT INS, 2004, TURN BACK TID CAS SU
[6]   Quantified analysis of the probability of flooding in the Thames estuary under imaginable worst-case sea level rise scenarios [J].
Dawson, RJ ;
Hall, JW ;
Bates, PD ;
Nicholls, RJ .
INTERNATIONAL JOURNAL OF WATER RESOURCES DEVELOPMENT, 2005, 21 (04) :577-591
[7]  
Defra, 2005, Technical Report
[8]  
DEFRA, 2001, NAT APPR ASS RISK FL
[9]   Assessing the robustness of adaptation decisions to climate change uncertainties: A case study on water resources management in the East of England [J].
Dessai, Suraje ;
Hulme, Mike .
GLOBAL ENVIRONMENTAL CHANGE-HUMAN AND POLICY DIMENSIONS, 2007, 17 (01) :59-72