Pre-combustion, post-combustion and oxy-combustion in thermal power plant for CO2 capture

被引:577
作者
Kanniche, Mohamed [1 ]
Gros-Bonnivard, Rene [1 ]
Jaud, Philippe [1 ]
Valle-Marcos, Jose [1 ]
Amann, Jean-Marc [2 ]
Bouallou, Chakib [2 ]
机构
[1] EDF, Div Res & Dev, Fluid Mech Energies & Environm Dept, F-78401 Chatou, France
[2] Mines ParisTech, CEP, F-75006 Paris, France
关键词
CO2; capture; Pre-combustion; Post-combustion; Oxy-combustion; REMOVAL;
D O I
10.1016/j.applthermaleng.2009.05.005
中图分类号
O414.1 [热力学];
学科分类号
摘要
This paper presents a summary of technical-economic studies. It allows evaluating, in the French context, the production cost of electricity derived from coal and gas power plants With the capture of CO2, and the cost per tonne of CO2 avoided. Three systems were studied: an Integrated Gasification Combined Cycle (IGCC). a conventional combustion of Pulverized Coal (PC) and a Natural Gas Combined Cycle (NGCC). Three main methods were envisaged for the capture of CO2 pre-combustion, post-combustion and oxy-combustion. For the IGCC, two gasification types have been studied. a current technology based on gasification of dry coal at 27 bars (Shell or GE/Texaco radiant type) integrated into a classical combined cycle providing 320 MWe. and a future technology (planned for about 2015-2020) based on gasification of a coal-water mixture (slurry) that can be compressed to 64 bars (GE/Texaco slurry type) integrated into an advanced combined cycle (type H with steam cooling of the combustion turbine blades) producing a gross power output of 1200 MWe. (C) 2009 Elsevier Ltd All rights reserved.
引用
收藏
页码:53 / 62
页数:10
相关论文
共 16 条
[1]  
Amann JM, 2007, SCI STUDY RES-CHEM C, V8, P77
[2]  
AMANN JM, 2007, CHEM ENG T, V12, P151
[3]   Integrated gasification gas combined cycle plant with membrane reactors: Technological and economical analysis [J].
Amelio, Mario ;
Morrone, Pietropaolo ;
Galucci, Fausto ;
Basile, Angelo .
ENERGY CONVERSION AND MANAGEMENT, 2007, 48 (10) :2680-2693
[4]  
[Anonymous], THESIS ECOLE MINES P
[5]  
[Anonymous], PH419 IEA GHG
[6]  
Biggs S, 2001, GREENHOUSE GAS CONTROL TECHNOLOGIES, P973
[7]   Efficiency of an Integrated Gasification Combined Cycle (IGCC) power plant including CO2 removal [J].
Descamps, C. ;
Bouallou, C. ;
Kanniche, M. .
ENERGY, 2008, 33 (06) :874-881
[8]  
Descamps C., 2002, P FUT EN SYST TECHN, P115
[9]  
Descamps C., 2003, P 16 INT C EFF COSTS, P39
[10]  
*EPRI, 2002, 1004483 EPRI