An optimal lot-sizing and offline inspection policy in the case of nonrigid demand

被引:20
作者
Anily, S [1 ]
Grosfeld-Nir, A
机构
[1] Tel Aviv Univ, Fac Management, IL-69978 Tel Aviv, Israel
[2] Acad Coll Tel Aviv Yaffo, Tel Aviv, Israel
关键词
D O I
10.1287/opre.1050.0258
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A batch production process that is initially in the in-control state can fail with constant failure rate to the out-of-control state. The probability that a unit is conforming if produced while the process is in control is constant and higher than the respective constant conformance probability while the process is out of control. When production ends, the units are inspected in the order they have been produced. The objective is to design a production and inspection policy that guarantees a zero defective delivery in minimum expected total cost. The inspection problem is formulated as a partially observable Markov decision process (POMDP): Given the observations about the quality of the items that have already been inspected, the inspector should determine whether to inspect the next unit or stop inspection and possibly pay shortage costs. We show that the optimal policy is of the control limit threshold (CLT) type: The observations are used to update the probability that the production process was still in control while producing the candidate unit for inspection. The optimal policy is to continue inspection if and only if this probability exceeds a CLT value that may depend on the outstanding demand and the number of uninspected items. Structural properties satisfied by the various CLT values are presented.
引用
收藏
页码:311 / 323
页数:13
相关论文
共 44 条
[1]   STRUCTURAL RESULTS FOR PARTIALLY OBSERVABLE MARKOV DECISION-PROCESSES [J].
ALBRIGHT, SC .
OPERATIONS RESEARCH, 1979, 27 (05) :1041-1053
[2]  
[Anonymous], 1971, THESIS I OPERATIONS
[3]  
[Anonymous], 1976, Mathematics in Science and Engineering
[4]   ECONOMIC DESIGN OF XBAR-CONTROL CHARTS UNDER WEIBULL SHOCK-MODELS [J].
BANERJEE, PK ;
RAHIM, MA .
TECHNOMETRICS, 1988, 30 (04) :407-414
[5]   BAYESIAN PROCESS-CONTROL FOR ATTRIBUTES [J].
CALABRESE, JM .
MANAGEMENT SCIENCE, 1995, 41 (04) :637-645
[6]   AN SPC MODEL FOR SHORT PRODUCTION-RUNS - MINIMIZING EXPECTED COST [J].
CROWDER, SV .
TECHNOMETRICS, 1992, 34 (01) :64-73
[7]   Manufacturing to order with random yield and costly inspection [J].
Grosfeld-Nir, A ;
Gerchak, Y ;
He, QM .
OPERATIONS RESEARCH, 2000, 48 (05) :761-767
[8]  
GROSS SR, 1996, UCLA LAW REV, V44, P3
[9]  
Hald A., 1981, STAT THEORY SAMPLING
[10]   A DICHOTOMOUS SEARCH FOR A GEOMETRIC RANDOM VARIABLE [J].
HASSIN, R .
OPERATIONS RESEARCH, 1984, 32 (02) :423-439