A parametric rule for planning and management of multiple-reservoir systems

被引:75
作者
Nalbantis, I
Koutsoyiannis, D
机构
[1] Department of Water Resources, Faculty of Civil Engineering, National Technical University, Athens
[2] Department of Water Resources, Faculty of Civil Engineering, National Technical University
关键词
D O I
10.1029/97WR01034
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A parametric rule for multireservoir system operation is formulated and tested. It is a generalization of the well-known space rule of simultaneously accounting for various system operating goals, in addition to the standard goal of avoiding unnecessary spills, including avoiding leakage losses, avoiding conveyance problems, taking into account the impacts of the reservoir system topology, and assuring satisfaction of secondary uses. Theoretical values of the rule's parameters for each one of these isolated goals are derived. In practice, parameters are evaluated to optimize one or more objective functions selected by the user. The rule is embedded in a simulation model so that optimization requires repeated simulations of the system operation with specific values of the parameters each time. The rule is tested on the case of the multireservoir water supply system of the city of Athens, Greece, which is driven by all of the operating goals listed above. Two problems at the system design level are tackled. First, the total release from the system is maximized for a selected level of failure probability. Second, the annual operating cost is minimized for given levels of water demand and failure probability. A detailed simulation model is used in the case study. Sensitivity analysis of the rule's parameters revealed a subset of insensitive parameters that allowed for rule simplification. Finally, the rule is validated through comparison with a number of heuristic rules also applied to the test case.
引用
收藏
页码:2165 / 2177
页数:13
相关论文
共 33 条
[1]   OPTIMUM RESERVOIR OPERATING POLICIES AND IMPOSITION OF A RELIABILITY CONSTRAINT [J].
ASKEW, AJ .
WATER RESOURCES RESEARCH, 1974, 10 (01) :51-56
[2]   CHANCE-CONSTRAINED DYNAMIC-PROGRAMMING AND OPTIMIZATION OF WATER-RESOURCE SYSTEMS [J].
ASKEW, AJ .
WATER RESOURCES RESEARCH, 1974, 10 (06) :1099-1106
[3]  
BOWER BT, 1962, DESIGN WATER RESOURC, P443, DOI DOI 10.4159/HARVARD.9780674421042.C14
[4]   REAL-TIME ADAPTIVE CLOSED-LOOP CONTROL OF RESERVOIRS WITH THE HIGH ASWAN DAM AS A CASE-STUDY [J].
BRAS, RL ;
BUCHANAN, R ;
CURRY, KC .
WATER RESOURCES RESEARCH, 1983, 19 (01) :33-52
[5]  
Clark E.J., 1950, J AM WATER WORK ASS, V42, P823
[6]  
Clark EJ, 1956, J AM WATER WORKS ASS, V48, P349
[7]  
Evenson D. E., 1970, WATER RESOUR B, V6, P725, DOI [DOI 10.1111/J.1752-1688.1970.TB01617.X, 10.1111/j.1752-1688.1970.tb01617.x]
[8]   GRADIENT DYNAMIC-PROGRAMMING FOR STOCHASTIC OPTIMAL-CONTROL OF MULTIDIMENSIONAL WATER-RESOURCES SYSTEMS [J].
FOUFOULA-GEORGIOU, E ;
KITANIDIS, PK .
WATER RESOURCES RESEARCH, 1988, 24 (08) :1345-1359
[9]   CONVEX INTERPOLATION FOR GRADIENT DYNAMIC-PROGRAMMING [J].
FOUFOULA-GEORGIOU, E .
WATER RESOURCES RESEARCH, 1991, 27 (01) :31-36
[10]   A NEW METHOD FOR THE REAL-TIME OPERATION OF RESERVOIR SYSTEMS [J].
GEORGAKAKOS, AP ;
MARKS, DH .
WATER RESOURCES RESEARCH, 1987, 23 (07) :1376-1390