A branch and bound algorithm for locating input and output points of departments on the block layout

被引:20
作者
Kim, JG [1 ]
Kim, YD [1 ]
机构
[1] Korea Adv Inst Sci & Technol, Dept Ind Engn, Yusong Gu, Taejon 305701, South Korea
关键词
facility layout; input and output points; branch and bound algorithm;
D O I
10.2307/3010000
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider the problem of locating input and output (I/O) points of each department for a given layout. The objective of the problem is to minimise the total distance of material flows between the I/O points. Here, distances between the I/O points are computed as the lengths of the shortest path (not the rectilinear distances) between the I/O points. We developed a procedure to eliminate dominated candidate positions of I/O points that do not need to be considered. With this procedure, a large number of dominated candidate positions can be eliminated. A linear programming (LP) model for minimising the total rectilinear distance of flows is used to obtain a lower bound. Using the elimination procedure and the LP model, a branch and bound algorithm is developed to find an optimal location of the I/O points. Results from computational experiments show that the suggested algorithm finds optimal solutions in a very short time even for large-sized problems.
引用
收藏
页码:517 / 525
页数:9
相关论文
共 14 条
[1]  
BANNERJEE P, 1995, INT J PROD RES, V33, P183
[2]   DoorFAST: A constructive procedure to optimally layout a facility including aisles and door locations based on an aisle flow distance metric [J].
Benson, B ;
Foote, BL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (07) :1825-1842
[3]  
CABOT AV, 1970, AIIE T, V2, P132
[4]   A HEURISTIC-PROCEDURE FOR THE LAYOUT OF A LARGE NUMBER OF FACILITIES [J].
DREZNER, Z .
MANAGEMENT SCIENCE, 1987, 33 (07) :907-915
[5]   Location of departmental pickup and delivery points for an AGV system [J].
Kim, J ;
Klein, CM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (02) :407-420
[6]  
Kim JG, 1998, IIE TRANS, V30, P947, DOI 10.1023/A:1007576923948
[7]   The facility layout problem: Recent and emerging trends and perspectives [J].
Meller, RD ;
Gau, KY .
JOURNAL OF MANUFACTURING SYSTEMS, 1996, 15 (05) :351-366
[8]   STRATEGIC INTERPOLATIVE DESIGN OF DYNAMIC MANUFACTURING SYSTEMS LAYOUTS [J].
MONTREUIL, B ;
VENKATADRI, U .
MANAGEMENT SCIENCE, 1991, 37 (06) :682-694
[9]   OPTIMIZING THE LOCATION OF INPUT OUTPUT STATIONS WITHIN FACILITIES LAYOUT [J].
MONTREUIL, B ;
RATLIFF, HD .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1988, 14 (03) :177-187
[10]   DYNAMIC LAYOUT DESIGN GIVEN A SCENARIO TREE OF PROBABLE FUTURES [J].
MONTREUIL, B ;
LAFORGE, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 63 (02) :271-286