A Two-Phase Iterative Heuristic Approach for the Production Routing Problem

被引:107
作者
Absi, N. [1 ]
Archetti, C. [2 ]
Dauzere-Peres, S. [1 ]
Feillet, D. [1 ]
机构
[1] Ecole Mines St Etienne, Dept Mfg Sci & Logist, F-13541 Gardanne, France
[2] Univ Brescia, Dept Econ & Management, I-25122 Brescia, Italy
关键词
lot sizing; production; distribution; routing; heuristics; INTEGRATED PRODUCTION; COMPUTATIONAL-COMPLEXITY; INVENTORY; ALGORITHM; MANAGEMENT; DECISIONS;
D O I
10.1287/trsc.2014.0523
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper investigates the integrated optimization of production, distribution, and inventory decisions related to supplying multiple retailers from a central production facility. A single-item capacitated lot-sizing problem is defined for optimizing production decisions and inventory management. The optimization of daily distribution is modeled as a traveling salesman problem or a vehicle routing problem depending on the number of vehicles. A two-phase iterative method, from which several heuristics are derived, is proposed that iteratively focuses on lot-sizing and distribution decisions. Computational results show that our best heuristic outperforms existing methods.
引用
收藏
页码:784 / 795
页数:12
相关论文
共 22 条
[1]   Optimization-Based Adaptive Large Neighborhood Search for the Production Routing Problem [J].
Adulyasak, Yossiri ;
Cordeau, Jean-Francois ;
Jans, Raf .
TRANSPORTATION SCIENCE, 2014, 48 (01) :20-45
[2]   Formulations and Branch-and-Cut Algorithms for Multivehicle Production and Inventory Routing Problems [J].
Adulyasak, Yossiri ;
Cordeau, Jean-Francois ;
Jans, Raf .
INFORMS JOURNAL ON COMPUTING, 2014, 26 (01) :103-120
[3]   Industrial aspects and literature survey: Combined inventory management and routing [J].
Andersson, Henrik ;
Hoff, Arild ;
Christiansen, Marielle ;
Hasle, Geir ;
Lokketangen, Arne .
COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (09) :1515-1536
[4]   Analysis of the maximum level policy in a production-distribution system [J].
Archetti, Claudia ;
Bertazzi, Luca ;
Paletta, Giuseppe ;
Speranza, M. Grazia .
COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (12) :1731-1746
[5]   COMPUTATIONAL-COMPLEXITY OF UNCAPACITATED MULTI-ECHELON PRODUCTION PLANNING PROBLEMS [J].
ARKIN, E ;
JONEJA, D ;
ROUNDY, R .
OPERATIONS RESEARCH LETTERS, 1989, 8 (02) :61-66
[6]   Tabu search with path relinking for an integrated production-distribution problem [J].
Armentano, V. A. ;
Shiguemoto, A. L. ;
Lokketangen, A. .
COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (08) :1199-1209
[7]   A branch-and-price algorithm for an integrated production and inventory routing problem [J].
Bard, Jonathan F. ;
Nananukul, Narameth .
COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (12) :2202-2217
[8]   Heuristics for a multiperiod inventory routing problem with production decisions [J].
Bard, Jonathan F. ;
Nananukul, Narameth .
COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 57 (03) :713-723
[9]   The integrated production-inventory-distribution-routing problem [J].
Bard, Jonathan F. ;
Nananukul, Narameth .
JOURNAL OF SCHEDULING, 2009, 12 (03) :257-280
[10]   COMPUTATIONAL-COMPLEXITY OF THE CAPACITATED LOT SIZE PROBLEM [J].
BITRAN, GR ;
YANASSE, HH .
MANAGEMENT SCIENCE, 1982, 28 (10) :1174-1186