Analysis and design of an adaptive minimum reasonable inventory control system

被引:54
作者
Towill, DR [1 ]
Evans, GN [1 ]
Cheema, P [1 ]
机构
[1] PA CONSULTING GRP,LONDON SW1W 9SR,ENGLAND
基金
英国工程与自然科学研究理事会;
关键词
minimum reasonable inventory; master production scheduling; decision support system;
D O I
10.1080/095372897234885
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A Master Production Scheduling Decision Support System within a multi-product medical supplies market has the dual task of providing good customer service levels while maintaining minimum reasonable levels of finished goods stock in the face of considerable internal manufacturing lead time and customer demand uncertainty. This paper examines the critical design parameters within an adaptive model highlighting how the total system orders in the internal pipeline are utilized in the decision-making process for assessing how much to load the internal manufacturing pipeline. Two different methods for tracking manufacturing lead times within the adaptive loop are also considered. Classical control concepts are applied within the Decision Support System (DSS) to avoid any long-term drift in finished stocks. Finally scenario analysis is performed via simulation for a set of design parameters and a range of stimuli typical of company operating situations. An effective decision support system design in terms of architecture and parameter settings is recommended based upon the ability of the model to maintain high customer service levels. The DSS readily interfaces between marketing and production functions to enhance company competitive advantage across a wide range of products.
引用
收藏
页码:545 / 557
页数:13
相关论文
共 17 条
[1]  
BENDAYA M, 1994, J OPER RES SOC, V45, P579, DOI 10.2307/2584393
[2]  
BOYLAN JE, 1994, J OPER RES SOC, V45, P838, DOI 10.1057/jors.1994.127
[3]  
CHEEMA P, 1994, THESIS U WALES COLL
[4]  
CHEEMA P, 1989, P 5 NAT C PROD RES H, P101
[5]  
COLEMAN JL, 1988, THESIS U WALES COLL
[6]   AN INTEGRATED APPROACH TO SOLVING THE MASTER AGGREGATE SCHEDULING PROBLEM [J].
DAS, SK ;
SARIN, SC .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 34 (02) :167-178
[7]  
DAVIS T, 1993, SLOAN MANAGEMENT SUM, P35
[8]  
FERRIS JS, 1990, THESIS U WALES COLL
[9]  
FORRESTER J. W., 1961, Industrial dynamics
[10]   A SHORT-TERM FORECASTING DSS FOR IMPROVING THE SALES MANUFACTURING LINKAGE [J].
GANGNEUX, P .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 17 (1-4) :369-375