Impact of deregulation on power delivery planning

被引:6
作者
Chao, XY [1 ]
Feng, XM [1 ]
Slump, DJ [1 ]
机构
[1] ABB Power T&D Co Inc, Raleigh, NC 27606 USA
来源
1999 IEEE TRANSMISSION AND DISTRIBUTION CONFERENCE, VOLS 1 & 2 | 1999年
关键词
market simulation; transmission planning; merchant power plant; market to market power trading;
D O I
10.1109/TDC.1999.755375
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 [电气工程]; 0809 [电子科学与技术];
摘要
This paper discusses the issues relating to power delivery planning and describes a planning process within the framework of market simulations in the deregulated environment. In particular, the uncertainty of new generation siting and transmission utilization and their impact on power delivery system planning are addressed by a market simulation model. This model has been used to determine incremental benefit of transmission services capability, value of new capacity versus competing market to market power trading, and most importantly the reliability of customer services.
引用
收藏
页码:340 / 344
页数:5
相关论文
共 3 条
[1]
CHAO XY, 1995, P IEEE PICA 1995 MAY
[2]
CHAO XY, P PMAPS 1997 VANC BC
[3]
CROUSILLAT EO, 1993, IEEE T POWER SYSTEMS, V8