A Review on Possible Approaches for Detecting Early Warning Signs in Projects

被引:21
作者
Haji-Kazemi, Sara [1 ]
Andersen, Bjorn [1 ]
Krane, Hans Petter [2 ]
机构
[1] Norwegian Univ Sci & Technol, Dept Prod & Qual Engn, N-7034 Trondheim, Norway
[2] Norwegian Univ Sci & Technol, Dept Civil & Transport Engn, N-7034 Trondheim, Norway
关键词
early warning signs; detection approaches; strengths; weaknesses; project management; PORTFOLIO MANAGEMENT;
D O I
10.1002/pmj.21360
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we attempt to provide an overview of the full extent of early warning detection approaches, which are directly or indirectly addressed in the literature. These approaches can aid project managers in taking corrective actions timely enough for preventing failures. The study is based on a review of the current literature within the field of early warning in project management and our own experiences gained from practice. An analysis of the strengths and weaknesses of each approach and their applications in different contexts are also performed. We conclude that the choice of the most effective approach is arguably dependent on the type of project, organizational culture, and the project environment.
引用
收藏
页码:55 / 69
页数:15
相关论文
共 51 条
[1]  
Ahern D.M., 2004, CMMI DISTILLED PRACT
[2]  
Anbari F.T., 2003, PROJ MANAG J, V34, P12, DOI [10.1109/EMR.2004.25113, DOI 10.1177/875697280303400403, 10.1177/875697280303400403]
[3]  
Andersen E. S., 2003, International Journal of Project Management, V21, P457, DOI 10.1016/S0263-7863(02)00088-1
[4]  
[Anonymous], 2000, GUID PROJ MAN BOD KN
[5]  
[Anonymous], 1990, Implanting Strategic Management
[6]  
[Anonymous], 1988, PROJECT MANAGEMENT J
[7]  
[Anonymous], 1987, THESIS U STRATHCLYDE
[8]  
[Anonymous], 2007, MAN SUCC PROGR
[9]   MANAGING STRATEGIC SURPRISE BY RESPONSE TO WEAK SIGNALS [J].
ANSOFF, HI .
CALIFORNIA MANAGEMENT REVIEW, 1975, 18 (02) :21-33
[10]  
Ashley D. B., 1989, P STAT ART PROJ RISK, P7