A grid-based scheduling system of manufacturing resources for a virtual enterprise

被引:24
作者
Hong, D
Li, C
Wang, CT
Deng, QN
机构
[1] Shanghai Jiao Tong Univ, Sch Mech & Power Engn, Shanghai 200030, Peoples R China
[2] Shanghai Jiao Tong Univ, Dept Comp Sci & Engn, Shanghai 200030, Peoples R China
关键词
exterior grid; interior grid; manufacturing resource; scheduling system; virtual enterprise;
D O I
10.1007/s00170-004-2335-9
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, a scheduling system of manufacturing resources for a virtual enterprise is built up based on grid technology. The scheduling system is composed of an exterior grid and an interior grid in the architecture, while the scheduling procedure of manufacturing resources in a virtual enterprise consists of two stages - distributed scheduling and local scheduling. The exterior grid is utilized to implement the distributed scheduling and the interior grid is used to accomplish the local scheduling. This paper illustrates the manufacturing system of a virtual enterprise based on an exterior grid and the manufacturing subsystem of a member enterprise based on an interior grid. Subsequently, the scheduling procedure of manufacturing resources within the virtual enterprise is described for a particular example. Finally, a case of collaborative production of a customized artificial joint (CAJ) in a virtual enterprise is applied to demonstrate the implementation of the scheduling system of manufacturing resources for the virtual enterprise. With grid technology, the efficiency of manufacturing resource scheduling in the virtual enterprise has been improved greatly.
引用
收藏
页码:137 / 141
页数:5
相关论文
共 12 条
[1]   A distributed resource management architecture that supports advance reservations and co-allocation [J].
Foster, I ;
Kesselman, C ;
Lee, C ;
Lindell, B ;
Nahrstedt, K ;
Roy, A .
IWQOS '99: 1999 SEVENTH INTERNATIONAL WORKSHOP ON QUALITY OF SERVICE, 1999, :27-36
[2]  
FOSTER I, 2001, INT J SUPERCOMPUTER, V15, P1
[3]  
FOSTER I, 1998, P SC 98 ACM NEW YORK
[4]  
FOSTER I, 1999, GRID BLUEPRING FUTUR
[5]  
Foster I.K., 2002, Global Grid Forum
[6]   Contract-driven creation and operation of virtual enterprises [J].
Hoffner, Y ;
Field, S ;
Grefen, P ;
Ludwig, H .
COMPUTER NETWORKS, 2001, 37 (02) :111-136
[7]   A due date density-based categorising heuristic for parallel machines scheduling [J].
Kim, SS ;
Shin, HJ ;
Eom, DH ;
Kim, CO .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2003, 22 (9-10) :753-760
[8]   Virtual enterprise - organisation, evolution and control [J].
Martinez, MT ;
Fouletier, P ;
Park, KH ;
Favrel, J .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 74 (1-3) :225-238
[9]   Workflow balancing strategies in parallel machine scheduling [J].
Rajakumar, S ;
Arunachalam, VP ;
Selladurai, V .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2004, 23 (5-6) :366-374
[10]  
VONLASZEWSKI G, 2001, P 34 ANN HAW INT C S, P9028