Study on the efficiency of the digging process using the model of excavator bucket

被引:46
作者
Maciejewski, J
Jarzebowski, A
Trampczynski, W
机构
[1] Polish Acad Sci, Inst Fundamental Technol Res, PL-00049 Warsaw, Poland
[2] Tech Univ Kielce, PL-25314 Kielce, Poland
关键词
excavation; earth-working machinery; digging process; bucket with teeth; laboratory tests;
D O I
10.1016/j.jterra.2003.12.003
中图分类号
X [环境科学、安全科学];
学科分类号
08 [工学]; 0830 [环境科学与工程];
摘要
In the first part of the paper, an experimental program is presented investigating the soil cutting problem, with the application of vertical rigid walls at various widths as the working tools. It was found that when the tool width equalled the width of the soil bin, the soil cutting problems might be treated as plane strain processes. For the tools for which no interaction with the sidewalls of the bin was observed, the zone of the plane strain deformations occurred in the central part of the tools. In the second part of this paper a new experimental program of laboratory tests is presented, for a tool model in the shape of an excavator's bucket equipped with teeth. The experimental verification of the influence of teeth (number of teeth and the position of teeth on the bucket's inside lip) on the efficiency of the digging cycle is the aim of this paper. For high values of teeth spacing, the superposition of the plane strain deformation mechanism with three-dimensional failure modes within the soil was observed. For the low values of teeth spacing, the teeth did not act as separate three-dimensional objects but as one wide tool built up from several modules. As a consequence, the deformation pattern in front of such an assembly of teeth was again the plane strain deformation pattern. (C) 2003 ISTVS. Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:221 / 233
页数:13
相关论文
共 9 条
[1]
*ESCO, 1999, SUPER, V5
[2]
JARZEBOWSKI A, 1995, ENG T, V43, P169
[3]
JARZEBOWSKI A, 1994, 6 EUR ISTVS C WIEN, P731
[4]
Laboratory optimization of the soil digging process [J].
Maciejewski, J ;
Jarzebowski, A .
JOURNAL OF TERRAMECHANICS, 2002, 39 (03) :161-179
[5]
MACIEJEWSKI J, 2001, ENG T, V49, P599
[6]
MROZ Z, 1994, P 3 INT WORKSH LOC B, P19
[7]
Plonecki L., 2000, Engineering Transactions, V48, P3
[8]
Plonecki L., 1998, Automation in Construction, V7, P401, DOI 10.1016/S0926-5805(98)00045-4
[9]
[No title captured]