System planning tools for the competitive market

被引:12
作者
Clayton, RE
Mukerji, R
机构
[1] General Electric Power Systems, Engineering
来源
IEEE COMPUTER APPLICATIONS IN POWER | 1996年 / 9卷 / 03期
关键词
D O I
10.1109/67.526855
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
A restructuring of the electric power business in the US is underway. The form of the restructuring will shift the industry focus from local, vertically integrated monopolies to regional, competitive, and unbundled corporate structures. The new order, generally called POOLCO, will not require any fundamentally new analytical system planning methods. It will, however, require the merging of existing generation and transmission (G&T) software into a new G&T system planning function. POOLCO will also require development of new accounting software and communication media.
引用
收藏
页码:50 / 55
页数:6
相关论文
共 5 条
[1]  
CLAYTON RE, 1995, ELECT POWER 1995 IND
[2]  
CLAYTON RE, 1995, TRANSM US TECHN C LC
[3]  
JOSKOW PL, 1996, ELECT J JAN
[4]  
MUKERJI R, 1995, AM POW C CHIC ILL MA
[5]  
SIMONS NW, 1993, PUBLIC UTILITIES FOR, V131