A multi-objective stochastic programming approach for supply chain design considering risk

被引:215
作者
Azaron, A. [1 ]
Brown, K. N. [2 ]
Tarim, S. A. [3 ]
Modarres, M. [4 ]
机构
[1] Dalhousie Univ, Dept Ind Engn, Halifax, NS, Canada
[2] Univ Coll Cork, Dept Comp Sci, Cork Constraint Computat Ctr, Cork, Ireland
[3] Hacettepe Univ, Dept Management, Ankara, Turkey
[4] Sharif Univ Technol, Dept Ind Engn, Tehran, Iran
基金
美国国家科学基金会; 爱尔兰科学基金会;
关键词
Supply chain management; Stochastic programming; Multiple-objective programming; Risk management;
D O I
10.1016/j.ijpe.2008.08.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we develop a multi-objective stochastic programming approach for supply chain design under uncertainty. Demands, supplies, processing, transportation, shortage and capacity expansion costs are all considered as the uncertain parameters. To develop a robust model, two additional objective functions are added into the traditional comprehensive supply chain design problem. So, our multi-objective model includes (i) the minimization of the sum of current investment costs and the expected future processing, transportation, shortage and capacity expansion costs, (ii) the minimization of the variance of the total cost and (iii) the minimization of the financial risk or the probability of not meeting a certain budget. The ideas of unreliable suppliers and capacity expansion, after the realization of uncertain parameters, are also incorporated into the model. Finally, we use the goal attainment technique to obtain the Pareto-optimal solutions that can be used for decision-making. (c) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:129 / 138
页数:10
相关论文
共 28 条
[1]   Robust process planning under uncertainty [J].
Ahmed, S ;
Sahinidis, NV .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (05) :1883-1892
[2]   An approach for strategic supply chain planning under uncertainty based on stochastic 0-1 programming [J].
Alonso-Ayuso, A ;
Escudero, LF ;
Garín, A ;
Ortuño, MT ;
Pérez, G .
JOURNAL OF GLOBAL OPTIMIZATION, 2003, 26 (01) :97-124
[3]   Time-cost trade-off via optimal control theory in Markov PERT networks [J].
Azaron, Amir ;
Katagiri, Hideki ;
Sakawa, Masatoshi .
ANNALS OF OPERATIONS RESEARCH, 2007, 150 (01) :47-64
[4]   A multi-objective discrete reliability optimization problem for dissimilar-unit standby systems [J].
Azaron, Amir ;
Katagiri, Hideki ;
Kato, Kosuke ;
Sakawa, Masatoshi .
OR SPECTRUM, 2007, 29 (02) :235-257
[5]   Modelling complex assemblies as a queueing network for lead time control [J].
Azaron, Amir ;
Katagiri, Hideki ;
Kato, Kosuke ;
Sakawa, Masatoshi .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 174 (01) :150-168
[6]  
Birge J.R., 1997, INTRO STOCHASTIC PRO
[7]   Robust investment model for long-range capacity expansion of chemical processing networks under uncertain demand forecast scenarios [J].
Bok, JK ;
Lee, H ;
Park, S .
COMPUTERS & CHEMICAL ENGINEERING, 1998, 22 (7-8) :1037-1049
[8]   Supply chain optimization in continuous flexible process networks [J].
Bok, JK ;
Grossmann, IE ;
Park, S .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2000, 39 (05) :1279-1290
[9]   Multi-objective optimization of multi-echelon supply chain networks with uncertain product demands and prices [J].
Chen, CL ;
Lee, WC .
COMPUTERS & CHEMICAL ENGINEERING, 2004, 28 (6-7) :1131-1144
[10]   Multiobjective optimization for a multienterprise supply chain network [J].
Chen, CL ;
Wang, BW ;
Lee, WC .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2003, 42 (09) :1879-1889