Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No.2

被引:260
作者
Eskesen, SD [1 ]
Tengborg, P [1 ]
Kampmann, J [1 ]
Veicherts, TH [1 ]
机构
[1] Ecole Polytech Fed Lausanne, ITA Working Grp 2, ITA, AITES, CH-1015 Lausanne, Switzerland
关键词
D O I
10.1016/j.tust.2004.01.001
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
These guidelines, Prepared by Working Group 2 (Research) of the International Tunnelling Association, are prepared in order to give guidance to all those who have the job of preparing the overall scheme for the identification and management of risks in tunnelling and underground projects. The guidelines provide owners and consultants with what is modern-day industry practice for risk assessment, and describes the stages of risk management throughout the entire project implementation from concept to start of operation. (C) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:217 / 237
页数:21
相关论文
共 21 条
[1]  
[Anonymous], 1984, DECISION RISK RELIAB
[2]  
[Anonymous], ITA WORLD TUNN C TUN
[3]  
Benjamin RJ, 1970, PROBABILITY STAT DEC
[4]  
BIELECKI R, 1998, RUSSIAN TUNNELLING S, P82
[5]  
*DEC INC, CRYST BALL US MAN
[6]   Risk and risk analysis in rock engineering [J].
Einstein, HH .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1996, 11 (02) :141-155
[7]  
*ENG COUNC, 1993, GUID RISK ISS
[8]  
Godfrey P., 1996, Control of Risk: A Guide to the Systematic Management of Risk from Construction
[9]  
ISAKSSON MT, 1999, P CHALL 21 CENT BALK
[10]   RISK ANALYSIS APPROACH TO SELECTION OF CONTRACTOR EVALUATION METHOD [J].
JASELSKIS, EJ ;
RUSSELL, JS .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1992, 118 (04) :814-821