Reliability constrained generation expansion planning with consideration of wind farms uncertainties in deregulated electricity market

被引:67
作者
Hemmati, Reza [1 ]
Hooshmand, Rahmat-Allah [1 ]
Khodabakhshian, Amin [1 ]
机构
[1] Univ Isfahan, Dept Elect Engn, Esfahan, Iran
关键词
Generation expansion planning; Wind farms; Deregulated electricity market; Reliability; Particle swarm optimization; SYSTEM;
D O I
10.1016/j.enconman.2013.08.002
中图分类号
O414.1 [热力学];
学科分类号
070201 [理论物理];
摘要
This paper addresses reliability constrained generation expansion planning (GEP) in the presence of wind farm uncertainty in deregulated electricity market. The proposed GEP aims at maximizing the expected profit of all generation companies (GENCOs), while considering security and reliability constraints such as reserve margin and loss of load expectation (LOLE). Wind farm uncertainty is also considered in the planning and GENCOs denote their planning in the presence of wind farm uncertainty. The uncertainty is modeled by probability distribution function (PDF) and Monte-Carlo simulation (MCS) is used to insert uncertainty into the problem. The proposed GEP is a constrained, nonlinear, mixed-integer optimization programming and solved by using particle swarm optimization (PSO) method. In this paper, Electricity market structure is modeled as a pool market. Simulation results verify the effectiveness and validity of the proposed planning for maximizing GENCOs profit in the presence of wind farms uncertainties in electricity market. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:517 / 526
页数:10
相关论文
共 24 条
[1]
Bakirtzis GA, 2012, ELECT POWER SYST RES
[2]
Identification of Generation Expansion Plans in Competitive Markets [J].
Cerda, P. ;
Larrain, M. ;
Rudnick, H. .
IEEE LATIN AMERICA TRANSACTIONS, 2011, 9 (05) :774-784
[3]
Generation expansion planning of the utility with refined immune algorithm [J].
Chen, SL ;
Zhan, TS ;
Tsay, MT .
ELECTRIC POWER SYSTEMS RESEARCH, 2006, 76 (04) :251-258
[4]
The influence of nuclear generation on CO2 emissions and on the cost of the Spanish system in long-term generation planning [J].
Delgado, F. ;
Ortiz, A. ;
Renedo, C. J. ;
Perez, S. ;
Manana, M. ;
Zobaa, Ahmed F. .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2011, 33 (03) :673-683
[5]
Fukuyama Y., 2008, FUNDAMENTALS PARTICL, P71
[6]
Hejrati Z., 2012, Optimization, V37, P99
[7]
Combination of AC Transmission Expansion Planning and Reactive Power Planning in the restructured power system [J].
Hooshmand, Rahmat-Allah ;
Hemmati, Reza ;
Parastegari, Moein .
ENERGY CONVERSION AND MANAGEMENT, 2012, 55 :26-35
[8]
Feasibility-based inexact fuzzy programming for electric power generation systems planning under dual uncertainties [J].
Hu, Qing ;
Huang, Guohe ;
Cai, Yanpeng ;
Huang, Ying .
APPLIED ENERGY, 2011, 88 (12) :4642-4654
[9]
Jadidoleslam M, 2011, P INT C EL ENG NETW
[10]
Application and comparison of metaheuristic techniques to generation expansion planning problem [J].
Kannan, S ;
Slochanal, SMR ;
Padhy, NP .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (01) :466-475