Example of a Hybrid Life-Cycle Assessment of Construction Processes

被引:160
作者
Bilec, Melissa [1 ]
Ries, Robert [1 ]
Matthews, H. Scott [2 ,3 ]
Sharrard, Aurora L. [2 ]
机构
[1] Univ Pittsburgh, Dept Civil & Environm Engn, Pittsburgh, PA 15261 USA
[2] Carnegie Mellon Univ, Dept Civil & Environm Engn, Pittsburgh, PA 15213 USA
[3] Carnegie Mellon Univ, Dept Engn & Publ Policy, Pittsburgh, PA 15213 USA
基金
美国国家科学基金会;
关键词
Construction management; Life cycles; Environmental issues; Buildings;
D O I
10.1061/(ASCE)1076-0342(2006)12:4(207)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Design and construction industries, along with owners, have an increasing interest in and responsibility for the environmental impacts of buildings. Since the environmental impacts of a building's life cycle are considerable, quantification of all phases is important, especially the construction phase, which is often glossed over. This research focuses on the construction phase of a building project. Generally, the life-cycle inventory created in performing a life-cycle assessment (LCA) is developed using either a process or input-output approach; however, both techniques have distinct advantages and disadvantages. A hybrid approach combining both methods' advantages has been proposed and will be demonstrated. Existing hybrid models are reviewed, along with a recommendation of a hybrid model for construction. A preliminary case study of a precast concrete parking garage's construction using hybrid LCA methodology is presented. Preliminary investigations indicate transportation, equipment activity, and support functions have the largest effects on the environment.
引用
收藏
页码:207 / 215
页数:9
相关论文
共 32 条
[1]  
Adriaanse A, 1993, ENV POLICY PERFORMAN
[2]  
American National Standards Institute/International Organization for Standardization (ANI/ISO), 1997, ENV MAN LIF CYCL ASS
[3]  
[Anonymous], 2003, THESIS U CALIFORNIA
[4]  
[Anonymous], IND ENV
[5]  
[Anonymous], 2003, J INFRASTRUCT SYST
[6]  
[Anonymous], 2000, ESTIMATED USE WATER
[7]  
Bullard C.W., 1978, Resour. Energy, V1, P267, DOI DOI 10.1016/0165-0572(78)90008-7
[8]  
Green Design Institute Carnegie Mellon University, 2004, EC INP OUTP AN LIF C
[9]   Economic input-output models for environmental life-cycle assessment [J].
Hendrickson, C ;
Horvath, A ;
Joshi, S ;
Lave, L .
ENVIRONMENTAL SCIENCE & TECHNOLOGY, 1998, 32 (07) :184A-191A
[10]   Resource use and environmental emissions of US construction sectors [J].
Hendrickson, C ;
Horvath, A .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2000, 126 (01) :38-44