Coordinating Large-Scale Wind Integration and Transmission Planning

被引:99
作者
Gu, Yang [1 ]
McCalley, James D. [2 ]
Ni, Ming [3 ]
机构
[1] Midwest Independent Transmiss Syst Operator Inc, St Paul, MN 55108 USA
[2] Iowa State Univ, Dept Elect & Comp Engn, Ames, IA 50011 USA
[3] State Grid Elect Power Res Inst, Nanjing 210003, Jiangsu, Peoples R China
关键词
Benders decomposition; contingency reserve; cooptimization; generation expansion planning; transmission expansion planning; wind integration; DECOMPOSITION APPROACH; EXPANSION; GENERATION;
D O I
10.1109/TSTE.2012.2204069
中图分类号
X [环境科学、安全科学];
学科分类号
083001 [环境科学];
摘要
In this paper, a generation expansion planning model and a transmission expansion planning model are proposed to inform investment decisions from the perspectives of generation companies and ISOs, respectively. Interactions between large-scale wind integration and transmission system planning are analyzed, and a new computational procedure of system expansion planning that coordinates generation and transmission investment is presented. The cooptimization of energy and ancillary services markets is considered to capture the impacts of wind power on the operation of the electric system. Benders decomposition is employed to reduce the overall computation time.
引用
收藏
页码:652 / 659
页数:8
相关论文
共 27 条
[1]
[Anonymous], 1979, IEEE T POWER AP SYST, V98, P2047, DOI 10.1109/TPAS.1979.319398
[2]
[Anonymous], 2002, NAT TRANSM GRID STUD
[3]
[Anonymous], 2011, E WIND INT TRANSM ST
[4]
Partitioning procedures for solving mixed-variables programming problems [J].
Benders, J. F. .
COMPUTATIONAL MANAGEMENT SCIENCE, 2005, 2 (01) :3-19
[5]
Brower M., 2009, DEV E REGIONAL WIND
[6]
Maximizing Firm Wind Connection to Security Constrained Transmission Networks [J].
Burke, Daniel J. ;
O'Malley, Mark J. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2010, 25 (02) :749-759
[7]
California ISO, SPINN RES NONSP RES
[8]
Energy and ancillary service dispatch for the interim ISO New England Electricity Market [J].
Cheung, KW ;
Shamsollahi, P ;
Sun, D ;
Milligan, J ;
Potishnak, M .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (03) :968-974
[9]
Dany G., 2011, P IEEE PORT POW TECH, V4
[10]
A new approach to quantify reserve demand in systems with significant installed wind capacity [J].
Doherty, R ;
O'Malley, M .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (02) :587-595