Interruptible load analysis using sequential Monte Carlo simulation

被引:11
作者
Chen, H [1 ]
Billinton, R [1 ]
机构
[1] Univ Saskatchewan, Power Syst Res Grp, Saskatoon, SK S7N 5A9, Canada
关键词
D O I
10.1049/ip-gtd:20010582
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Electric utilities are increasingly examining cost-effective opportunities to utilise demand-side management initiatives, such as interruptible contracts to reduce the need for additional capacity. Techniques are presented for conducting interruptible load analysis using sequential Monte Carlo simulation. A bisection search approach was developed to effectively determine the interruptible load carrying capability. An index, designated the avoidable additional generating capacity, is proposed and a procedure to calculate it is presented. Numerical studies were performed to indicate the possible applications of the proposed techniques.
引用
收藏
页码:535 / 539
页数:5
相关论文
共 4 条
[1]   A RELIABILITY TEST SYSTEM FOR EDUCATIONAL PURPOSES - BASIC DATA [J].
BILLINTON, R ;
KUMAR, S ;
CHOWDHURY, N ;
CHU, K ;
DEBNATH, K ;
GOEL, L ;
KHAN, E ;
KOS, P ;
NOURBAKHSH, G ;
OTENGADJEI, J .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1989, 4 (03) :1238-1244
[2]  
Billinton R., 1994, Reliability assessment of electrical power systems using Monte Carlo methods
[3]  
BILLINTON R, 1991, SASKATCHEWAN ELECT E
[4]   MARKETS AND PRICING FOR INTERRUPTIBLE ELECTRIC-POWER [J].
GEDRA, TW ;
VARAIYA, PP .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1993, 8 (01) :122-128