Operator-scheduling using a constraint satisfaction technique in port container terminals

被引:19
作者
Kim, KH [1 ]
Kim, KW
Hwang, H
Ko, CS
机构
[1] Pusan Natl Univ, Dept Ind Engn, Pusan 609735, South Korea
[2] Korea Adv Inst Sci & Technol, Dept Ind Engn, Taejon 305701, South Korea
[3] Kyungsung Univ, Dept Ind Engn, Pusan 608736, South Korea
关键词
operator-scheduling; container terminal; constraint-satisfaction problem;
D O I
10.1016/j.cie.2003.12.017
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In port container terminals, the efficient scheduling of operators of handling equipment such as container cranes, yard cranes, and yard trucks is important. Because of many complicated constraints, finding a feasible solution, as opposed to the optimal solution, within a reasonable amount of computing time can be considered satisfactory from a practical point of view. The major constraints include the following: restrictions on the minimum workforce assignment to each time slot, the maximum total operating time per operator per shift, the minimum and maximum consecutive operating times for an operator, types of equipment that can be assigned to each operator, and the available time slots for each operator or piece of equipment. The operator-scheduling problem is defined as a constraint-satisfaction problem, and its solution is obtained by utilizing a commercial software. An actual problem, collected from a container terminal in Pusan, Korea, is solved through the solution procedure proposed in this study. (C) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:373 / 381
页数:9
相关论文
共 9 条
[1]  
BAKER KR, 1979, AIIE T, V11, P286, DOI 10.1080/05695557908974473
[2]   SCHEDULING OF WORK FORCES REQUIRED IN CONTINUOUS OPERATIONS UNDER ALTERNATIVE LABOR POLICIES [J].
BROWNELL, WS ;
LOWERRE, JM .
MANAGEMENT SCIENCE, 1976, 22 (05) :597-605
[3]   SCHEDULING MEDICAL RESIDENTS TO ROTATIONS - SOLVING THE LARGE-SCALE MULTIPERIOD STAFF ASSIGNMENT PROBLEM [J].
FRANZ, LS ;
MILLER, JL .
OPERATIONS RESEARCH, 1993, 41 (02) :269-279
[5]   NURSE SCHEDULING USING MATHEMATICAL-PROGRAMMING [J].
MILLER, HE ;
PIERSKALLA, WP ;
RATH, GJ .
OPERATIONS RESEARCH, 1976, 24 (05) :857-870
[6]   CYCLIC NURSE SCHEDULING [J].
ROSENBLOOM, ES ;
GOERTZEN, NF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1987, 31 (01) :19-23
[7]   OPTIMAL SCHEDULING OF 2 CONSECUTIVE IDLE PERIODS [J].
TIBREWALA, R ;
PHILLIPP.D ;
BROWNE, J .
MANAGEMENT SCIENCE SERIES A-THEORY, 1972, 19 (01) :71-75
[8]   SCHEDULING NURSING PERSONNEL ACCORDING TO NURSING PREFERENCE - MATHEMATICAL-PROGRAMMING APPROACH [J].
WARNER, DM .
OPERATIONS RESEARCH, 1976, 24 (05) :842-856
[9]  
WEIL G, 1995, IEEE ENG MED BIO JUL, P417