Integration and Test Sequencing for Complex Systems

被引:8
作者
Boumen, Roel [1 ]
de Jong, Ivo S. M. [1 ]
Mestrom, J. M. G. [3 ]
de Mortel-Fronczak, J. M. van [2 ]
Rooda, J. E. [2 ]
机构
[1] ASML Netherlands BV, NL-5504 Veldhoven, Netherlands
[2] Eindhoven Univ Technol, Dept Mech Engn, NL-5600 MB Eindhoven, Netherlands
[3] Oce Technol BV, NL-5900 Venlo, Netherlands
来源
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS | 2009年 / 39卷 / 01期
关键词
Integration; manufacturing machines; semiconductor industry; test sequencing; test strategy; MECHANICAL ASSEMBLY SEQUENCES; ALGORITHM;
D O I
10.1109/TSMCA.2008.2006374
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
080201 [机械制造及其自动化];
摘要
The integration and test phase of complex manufacturing machines, like an ASML lithographic manufacturing system, is expensive and time consuming. The tests that can be performed at a certain point in time during the integration phase depend on the modules that are integrated and, therefore, on the preceding integration sequence. In this paper, we introduce a mathematical model to describe an overall integration and test sequencing problem, and we propose an algorithm to solve this problem. The method is a combination of integration sequencing and test sequencing. Furthermore, we introduce several strategies that determine when test phases should start. With a case study within the development of a software release that is used to control an ASML lithographic machine, we show that the described method and strategies can be used to solve real-life problems.
引用
收藏
页码:177 / 187
页数:11
相关论文
共 12 条
[1]
Risk-Based Stopping Criteria for Test Sequencing [J].
Boumen, R. ;
de Jong, I. S. M. ;
Vermunt, J. W. H. ;
van de Mortel-Fronczak, J. M. ;
Rooda, J. E. .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS, 2008, 38 (06) :1363-1373
[2]
Test sequencing in complex manufacturing systems [J].
Boumen, R. ;
de Jong, I. S. M. ;
Vermunt, J. W. H. ;
van de Mortel-Fronczak, J. M. ;
Rooda, J. E. .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS, 2008, 38 (01) :25-37
[3]
BOUMEN R, 2006, INTEGRATION SEQUENCI
[4]
BOUMEN R, 2007, INTEGRATION TEST SEQ
[5]
DELCHAMBRE A, 1989, P INT C EXP SYST ENG
[6]
A CORRECT AND COMPLETE ALGORITHM FOR THE GENERATION OF MECHANICAL ASSEMBLY SEQUENCES [J].
DEMELLO, LSH ;
SANDERSON, AC .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1991, 7 (02) :228-240
[7]
REPRESENTATIONS OF MECHANICAL ASSEMBLY SEQUENCES [J].
DEMELLO, LSH ;
SANDERSON, AC .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1991, 7 (02) :211-227
[8]
Hanh V.L., 2001, P 15 EUR C OBJ OR PR, P381
[9]
START: System testability analysis and research tool [J].
Pattipati, Krishna R. ;
Deb, Somnath ;
Dontamsetty, Mahesh ;
Maitra, Amit .
IEEE Aerospace and Electronic Systems Magazine, 1991, 6 (01) :13-20
[10]
APPLICATION OF HEURISTIC-SEARCH AND INFORMATION-THEORY TO SEQUENTIAL FAULT-DIAGNOSIS [J].
PATTIPATI, KR ;
ALEXANDRIDIS, MG .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS, 1990, 20 (04) :872-887