共 18 条
[1]
Allam S. I. G., 1998, J CONSTR MGMT EC E F, V6, P93
[2]
COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
[J].
MANAGEMENT SCIENCE SERIES B-APPLICATION,
1975, 21 (08)
:944-955
[3]
RESOURCE LEVELING IN CONSTRUCTION BY OPTIMIZATION
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1989, 115 (02)
:302-316
[6]
GOLDBERG DE, 1989, GENETIC ALDORITHMS S
[7]
Harris R., 1978, RESOURCE ARROW NETWO
[9]
Hegazy T, 1998, COST ENG J, V4, P25
[10]
JOHNSON RV, 1992, PROJECT MANAGEMENT J, V22, P39