Integrated production maintenance and quality model for imperfect processes

被引:40
作者
Ben-Daya, M [1 ]
机构
[1] King Fahd Univ Petr & Minerals, Dept Syst Engn, Dhahran 31261, Saudi Arabia
关键词
D O I
10.1080/07408179908969852
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we develop an integrated model for the joint optimization of the economic production quantity, the economic design of (x) over bar-control chart, and the optimal maintenance level. This is done for a deteriorating process where the in-control period follows a general probability distribution with increasing hazard rate. In the proposed model, Preventive Maintenance (PM) activities reduce the shift rate to the out-of-control state proportional to the PM level. Compared to the case with no PM, the extra cost of maintenance results in lower quality control cost which may lead to lower overall expected cost. These issues are illustrated using an example of a Weibull shock model with an increasing hazard rate.
引用
收藏
页码:491 / 501
页数:11
相关论文
共 15 条
[1]   ECONOMIC DESIGN OF XBAR-CONTROL CHARTS UNDER WEIBULL SHOCK-MODELS [J].
BANERJEE, PK ;
RAHIM, MA .
TECHNOMETRICS, 1988, 30 (04) :407-414
[2]  
BENDAYA M, 1998, IN PRESS EUROPEAN J
[3]   IMPERFECT REPAIR [J].
BROWN, M ;
PROSCHAN, F .
JOURNAL OF APPLIED PROBABILITY, 1983, 20 (04) :851-859
[5]   PRODUCTION LOT SIZING WITH MACHINE BREAKDOWNS [J].
GROENEVELT, H ;
PINTELON, L ;
SEIDMANN, A .
MANAGEMENT SCIENCE, 1992, 38 (01) :104-123
[6]  
HARTMAN HH, 1992, SUCCESSFULLY INSTALL
[7]  
Hax A., 1984, PRODUCTION INVENTORY
[8]  
HOOKE R, 1961, J ACM, V8, P212, DOI 10.1145/321062.321069
[9]   SIMULTANEOUS DETERMINATION OF PRODUCTION CYCLE AND INSPECTION SCHEDULES IN A PRODUCTION SYSTEM [J].
LEE, HL ;
ROSENBLATT, MJ .
MANAGEMENT SCIENCE, 1987, 33 (09) :1125-1136
[10]   SEQUENTIAL IMPERFECT PREVENTIVE MAINTENANCE POLICIES [J].
NAKAGAWA, T .
IEEE TRANSACTIONS ON RELIABILITY, 1988, 37 (03) :295-298